NUMBER |
AUTHOR |
DATE |
TITLE |
176 |
A. Brutman, K. Yip |
09/08/2022 |
Evaluating radiological hazards at proposed additions to MIRP using Monte Carlo simulation |
175 |
J. Zweifel, K. Yip |
08/19/2021 |
Monte Carlo simulations of
radiological issues for Electron-Ion Collider around Interaction Point 12
of Relativistic Heavy Ion Collider |
174 |
S. Gray, K. Yip |
08/08/2019 |
Reevaluating Linear Accelerator
Shielding for 320 µA of Proton Beam |
173 |
Z.S. Rechav, K. Yip |
08/18/2020 |
Investigating Radiation at RHIC
access road using Monte Carlo Simulation |
172 |
J. Mendes, K. Yip |
10/22/2019 |
Evaluating the Radiation Dose Around
a Hot Cell after the Bombardment of a Thorium Target |
171 |
K. Yip |
09/17/2019 |
Comparison between MCNP6.2 and
Fluka in energy deposition simulation for a thin Titanium Window |
170 |
K. Yip, D. Niedzielski |
08/13/2018 |
Using Monte Carlo Methods to
Estimate Occupational Dosage During 225AC Production |
169 |
K. Yip |
02/25/2013 |
Comparison between MCNPX and
MARS with or without magnetic field |
168 |
K. Yip |
12/1/2010 |
Simulation of
Soil Activation of Gold-Ions Hitting a Tungsten Target at J7 of AGS |
167 |
I-H. Chiang, et al. |
06/7/2010 |
From
Conducting Paint to Ion Chamber and Beam Profile Monitor |
166 |
K. Yip |
05/28/2010 |
Simulation of Gold-Ions Hitting Beam Elements in the
ATR |
165 |
I-H. Chiang, et al. |
07/15/2009 |
Development of
the Pixel Chamber |
164 |
Kin Yip |
01/23/2006 |
Polarization with various Time-Of-Flight cuts |
163 |
Kin Yip |
01/23/2006 |
AGS Polarimetry DAQ upgrade and its usage |
162 |
Kin Yip |
11/14/2005 |
Soil Activation in
various AGS/RHIC sites by Monte Carlo simulation |
161 |
Kin Yip |
11/10/2005 |
Shielding & background studies around the 6
o'clock area at RHIC (STAR) |
160 |
I-H. Chiang, et al |
02/28/2005 |
EPM (External Beam Profile Monitor) |
159 |
Kin Yip |
09/19/2003 |
Naive KOPIO Neutral
Beam Dump Simulation Studies |
158 |
A. J. Stevens |
08/02/2001 |
Estimating Induced
Activity Using 'Danger Parameters" |
157 |
A. J. Stevens |
06/20/2000 |
N-Shield, Description |
156 |
A. J. Stevens |
07/12/00 |
Summary of Fault Study Results
at RHIC |
155 |
P. Gill |
02/03/97 |
Ultimate Tensile Stress of K129 Fabric used on
the B5 Window |
154
|
V. Castillo et al |
05/01/98 |
Motor Control System for the
Expt No 821 "Plan B" Compressor |
153 |
I-H. Chiang, et al |
03/17/98 |
Water Cooled Platinum C
Target |
152 |
E. Lessard, C. Schaefer |
03/28/96 |
Target Radioactivity Content at AGS |
151 |
E. B. Forsyth |
03/01/95 |
Notes on the Proposed Horn Power Supply |
150 |
A. Soukas, F. Toldo |
02/03/95 |
Powering System for the E787 Detector Magnet |
149 |
E. Beadle |
10/25/94 |
A Unifying Viewport in Transform Theory |
148 |
E. Beadle |
09/30/94 |
The Response of Integrators & Low Pass
Filters to Random Inputs |
147 |
G. Bennett, et al |
08/18/93 |
The prototype Skinny Shield Radiation Monitor
System |
146 |
T. Tallerico |
04/09/93 |
New SEC I/F Converter Design Description |
145 |
E. Beadle |
03/03/93 |
C10 Amplifier Isolated Buffer |
144 |
E. Beadle |
02/23/93 |
Prototype Wide-Band Analog Fiber Optic Link |
143 |
E. Beadle |
01/27/93 |
The Electronics for the EPM |
142 |
D. Beavis |
10/28/92 |
Dump It! Conceptual Design of E864 Beam Dump
& Shield Walls |
141 |
E. Beadle, B. Clay |
07/27/92 |
Integrator Modifications for Booster Loss
Monitor System |
140 |
A. Stillman, A. Ravenhall |
05/04/92 |
Tests of a Remote Sensing Thermometer for C
Target |
139 |
E. Beadle |
01/21/92 |
C10 SEC Preamplifier |
138 |
D. Beavis |
09/23/91 |
Ring Me! Potential Radiation Levels from Beam
Faults in the AGS Ring |
137 |
I-H. Chiang, D. Kipp |
03/09/90 |
Development of the Transverse Residual Gas
Ionization SWIC for High Intensity Proton Beam a/k/a EPM |
136 |
D. Beavis |
01/29/90 |
Activate Me! Air Activation Estimates for the
g-2 Target Area |
135 |
D. Beavis |
12/05/89 |
Soil Me! Soil Activation
Estimates for the g-2 Target Area and Beam Dump |
134 |
D. Beavis |
10/18/89 |
Dump Me, Two/Beam Stop Design for the 2 GeV/c Beamline |
133 |
A. Pendzick, et al |
06/09/89 |
Building 919 Floor Stability |
132 |
W. Leonhardt |
05/24/89 |
Shielding block Lug Failures |
131 |
D.Beavis, et al |
11/10/88 |
High Intensity Target Station Study, Phase I |
130 |
D. Beavis |
07/06/88 |
Dump Me/Beam Dump Requirements for a 1013
Primary Beam |
129 |
G. A. Smith |
07/29/87 |
The SEB/HITL Four-Channel Gated Integrator |
128 |
D. Peaslee |
09/01/87 |
Conceptual Design of an Antiproton Facility
at BNL |
127 |
G. Bunce |
06/25/87 |
D-Line Archival Notes |
126 |
G. Bunce |
06/22/87 |
Polarized Proton Luminosity in RHIC |
125 |
R. Imossi |
06/01/87 |
BNLDAG VAX Gmail |
124 |
R. Imossi |
06/10/87 |
VAX/VMS Mail |
123 |
R. Imossi |
06/01/87 |
BNLDAG VAX Networks |
122 |
A Stillman |
05/11/87 |
An Analysis of the Cost of Converting the
LEBT Line to Eurocard Format |
121 |
A. Soukas |
04/11/87 |
AGS Main Ring Loss Monitor Systems/External
Beam Loss Monitor System |
120 |
A. Soukas |
04/09/87 |
External Beam Line Ramped Magnets |
119R |
G. Danby, J. Jackson |
06/18/87 |
Ultra Precise Magnet
Design and Shimming Studies |
119 |
G. Danby, J. Jackson |
04/13/87 |
Ultraprecise magnet Design and Shimming
Studies APPENIDX |
118 |
D. Beavis |
03/31/87 |
Beam Me! Life in the B1 Beam Line |
117 |
I-H. Chiang |
03/11/86 |
Requirements of Instrumentation During the FY
1987 Heavy Ion Run |
116 |
D. Lazarus et al |
07/19/85 |
The Dependence of Low Momentum Particle
Production on Target Material and Thickness |
115 |
G. Bunce |
07/16/85 |
791 Experimental Area |
114 |
G. Bunce |
07/07/85 |
791 Neutral Beam |
113 |
G. Bunce |
07/03/85 |
791 Primary Beam |
112 |
G. Bunce |
06/03/85 |
B5 Tunes for Exp 766 |
111 |
G. Bunce |
06/03/85 |
A3 Line Tune/Beam Line Information |
110 |
H. Poth |
05/85 |
A New Approach to a Pure Antiproton Beam at
GeV Energies |
109 |
I-H. Chiang |
01/30/85 |
Some Comments on CAMAC, IEEE488 and PC |
108 |
D. Lazarus |
11/21/84 |
Heavy Ion Physics |
107 |
D. C. Peaslee |
05/07/84 |
Resonance Search with pp |
106 |
G. A. Smith |
04/16/84 |
Radiation Level Decay in the U-Line |
105 |
R. Thern, S. P. Yamin |
09/27/83 |
Accumulator/Booster Alternative |
104 |
I-H. Chiang et al |
09/29/83 |
Operation of AGS SWICS Incorporating an 8085
Microprocessor |
103 |
G. Benenson |
07/28/83 |
16-Channel Timing Card with Q-Bus Interface |
102 |
G. Benenson |
06/30/83 |
Datacon/Q-Bus Interface Based on DRV11-P |
101 |
G. Bunce |
10/21/82 |
Physics with High Intensity Polarized Protons |
100 |
J. Li et al |
08/28/81 |
20 Kilogauss Solenoid Magnet |
99 |
H. Brown et al |
07/07/81 |
D-Line Study |
98 |
R. Hulliger A. Soukas |
07/06/81 |
Pulsed Operation of Experimental Magnet
Power
Supplies
|
97 |
D. Dayton |
06/26/81 |
How to Determine
DT (Temperature
Differential), Given Volts & Amps (P=EI) or Amps
and Resistance (P=I2R)
and Flow (GPM) |
96 |
B. Ewing |
04/29/81 |
Data Plotting and Resistance Calculation
Program |
95 |
A. S. Carroll |
04/01/81 |
Costs of Running FEB and SEB Programs
Combined and Alternating |
94 |
R. K. Stoehr |
03/13/81 |
Looping Analog Data Taking Programs
|
93 |
G. Bunce et al |
08/27/80 |
A Study of the Sensitivity of an ISABELLE cosq Dipole to Radiation Heating (replaced by BNL Formal Report
EPS 81-1 dated 3/18/81) |
92 |
W. L. Keith, G. Gulotta |
07/10/80 |
Analysis of the Cooldown Time for the D Bend
Superconducting Magnets |
91 |
S. Edwards, E. Lowenstein |
06/06/80 |
Guide to Restaurants (revised 07/81 by P
Baggett and E Hupfer) |
90 |
H. Brown |
06/02/80 |
A Time Separated p Beam |
89 |
P. Yamin |
07/27/79 |
Performance of the C1 Beam |
88 |
P. Yamin |
07/20/79 |
The ISA Detector Test Facility |
87 |
J. Fox et al |
05/11/79 |
A Measurement of the Production of Low Energy
Pions at large Angles from the AGS Proton Beam |
86 |
V. Kovarik, R. Stoehr |
03/02/79 |
Analog Sampling Program 2 |
85 |
V. Kovarik, R. Stoehr |
11/20/78 |
Analog Sampling program |
84 |
H. Brown |
07/26/78 |
Calibration of the Internal Hall Probes in
A1D5 and A1D6 (Beam Spectrometer Magnets) |
83 |
H. Brown |
04/26/78 |
Calibration of magneto-Resistive probes in
A1D5 and A1D6 (Beam Spectrometer Magnets) |
82 |
H. Brown |
|
Supplementary Details of the new SEB
Switchyard |
81 |
L. Chimienti et al |
08/04/76 |
Standardization of Nomenclature &
Identification Symbols for the Beam Transport Lines External to the AGS Accelerator |
80 |
R. Frankel, D. Lowenstein |
05/27/76 |
A Datacon-CAMAC Module for the DIBBUK Control
System |
79 |
V. Kovarik |
10/23/75 |
DATCHK: Computer Checkout of Datacon II on
the PDP-11 |
78 |
S. DeGennaro, V. Kovarik |
8/21/75 |
Datacon II Bidirectional Line Repeater
|
77 |
E. Jablonski |
08/15/75 |
SEB Instrumentation Gas Distribution System |
76 |
H. Brown |
06/19/75 |
Maximum Intensity Pion Beams |
75 |
D. Lowenstein |
05/07/75 |
DIBBUK Users Guide |
|
|
|
Rev 1 05/27/76,
Rev 2 04/12/77,
Rev 3 04/12/78,
Rev 4
05/31/84 |
74 |
A. Carroll |
01/27/75 |
How to Operate Beam 5A |
73 |
S. Hsieh |
12/03/74 |
1974 Summer Program - Magnetic Measurement
Group |
72 |
D. Ryan |
09/09/74 |
Optics of Beam #B5 |
71 |
D. Ryan, et al |
09/05/74 |
Neutron Spectrum in Beam #6A |
70 |
W. G. Walker |
06/19/74 |
Progress During FY 1974 |
69 |
D. Lowenstein |
03/01/74 |
Computer Control of Secondary Beams |
68 |
F. Thornhill |
04/02/74 |
Use of the Multi-Purpose Transformer Units |
67 |
W. J. Willis |
08/22/73 |
Ideas For a New Low Energy Separated Beam |
66 |
W. J. Willis |
08/22/73 |
Positional Stability of the EEBA Floor &
of a Long Shielding Block |
65 |
H. Brown |
06/21/73 |
HEBT Emittance Programs: LINEM and EMITT |
64 |
R. Rubinstein et al |
06/28/73 |
Some More Observed Properties of the Low
Energy Separated Beam |
63 |
R. Loper |
06/26/73 |
Computer Control in AGS Experimental Area |
62 |
C. T. Murphy |
04/30/73 |
MESB Design Notes: Mass Slit Operation and
Pion Contamination |
61 |
R. Loper |
04/25/73 |
Test Report of a Wire Grid Electrode in an
Electrostatic Separator |
60 |
Y. Y. Lee |
04/09/73 |
The Energy Deposition Downstream of Target
Stations by Hadrons |
59 |
C. T. Murphy |
03/28/73 |
MESB Design Notes: I Tolerances on the
Uniformity of I Bld in D1 and D2 |
58 |
V. Kovarik |
03/14/73 |
Signal Specifications and Transceiver
Operation for DATACON II System |
57 |
S. S. Yamamoto |
08/30/72 |
Computer Control of the AGS Beams |
56 |
F. Thornhill, F. Toldo
|
11/14/72 |
Proposed Modifications to Beam Transport
Magnet Power Supplies to Prevent Damage Resulting from Power Dips |
55 |
J. Marx |
11/06/72 |
Hyperon Physics for Pedestrians |
54 |
A. Carroll et al |
11/1/72 |
Some Observed Properties of the Low Energy
Separated Beam |
53 |
B. Culwick |
06/03/72 |
PDP 11 - Datacom Interface |
52 |
B. Culwick |
06/26/72 |
Datacom Interface to Magnets Power Supplies |
51 |
B. Culwick et al |
06/21/72 |
I/Ø Conflicts
for Tasks and Terminals |
50 |
B. Culwick |
07/28/72 |
DATCOM Serial Transmission System for the
PDP-11 |
49 |
V. J. Kovarik |
05/19/72 |
Single Wire Datacom Link |
48 |
T. Blair, D. Lazarus |
05/09/72 |
How to Play the Test Beam |
47 |
J. Fox |
04/13/72 |
A Low Energy Differential Cerenkov Counter |
46 |
D. E. Easler |
03/14/72 |
Station "C" Single Wire Control
System-Device Card |
45 |
D. E. Easler |
03/09/72 |
Station "C" Single Wire Control
System-Digital/Analog Converter |
44 |
R. Gibbs |
02/14/72 |
Beam Splitter Refrigerator/Liquefier Test
Summary Conducted at the Cosmotron Helium Test Facility |
43 |
J. D. Fox |
01/28/72 |
Measurement of Radiative Heat Input to
Object near an External Proton Beam Target |
42 |
Y. Y. Lee, D. Lazarus |
12/06/71 |
G-10 Monitoring Systems |
41 |
J. D. Fox, C. T. Murphy |
11/01/71 |
Characteristics of MESB Description for Users |
40 |
M. Coy |
08/25/71 |
Laser-Ultrasonic Interaction and Laser
Investigation of Phonon Behavior: Vigorous New Fields of Non-Linear
Optics |
39 |
D. Berley |
06/09/71 |
Purification of Particle Beams for
Radiotherapy |
38 |
J. D. Fox |
12/22/70 |
Modification of Medium Energy Separated Beam
(MESB) B2 |
37 |
H. J. Thomas |
12/10/70 |
Gaseous Helium Utilization for Helium Bags |
36 |
H. Brown et al |
9/23/70 |
Field Ramping in Solid Core Bending Magnets |
35 |
J. D. Fox |
05/12/70 |
Simple Beam Splitter for the Slow Extracted
Beam |
34 |
eds D. Berley, W. Walker
|
04/21/70 |
Experimental Planning and Support
Contribution for Annual Report FY 1970 |
33 |
J. D. Fox |
04/20/70 |
Measurement of Duty Factor in the Slow
External Beam |
32 |
J. Detweiler, T. Toohig |
01/13/70 |
Preliminary Report on Beam 10, The 0o
Charged Particle Beam From Target Station A of the SEB |
31 |
E. A. Kessler |
07/02/69 |
The Welding of Aluminum Buss |
30 |
T. E. Toohig |
06/17/69 |
Operation and Security Requirements for the
Neutral Beam Port at 0o from Target Station A |
29 |
T. E. Toohig |
06/03/69 |
Heat Dissipation in a Thin Window
Near the Focus of the SEB |
28 |
T. E. Toohig |
05/23/69 |
Radiation Stops in the SEB Extension |
27 |
eds J. Sanford, W. Walker |
04/04/69 |
Experimental Division Progress in FY69 |
26 |
C. L. Wang |
03/11/69 |
Possibility of Obtaining Secondary Alpha
Beams at AGS |
25 |
G. Danby et al |
02/25/69 |
AGS Lattice Corrections and Tuning |
24 |
J. C. Walker |
02/13/69 |
DC Beam Separator Electrode Sheets: Stud
Fastening by Electron Beam Welding |
23 |
T. E. Toohig |
12/26/98 |
An Overview of Particle Flux Models for 2000
GeV Scaling |
22 |
G. E. Tanguay |
12/16/68 |
G10 BeO Ceramic Target, Its Location, and
Related Data [Addendum] |
21 |
R. A. Loper |
12/03/68 |
Recent Improvements in the Performance of the
Electrostatic Separators |
20 |
J. D. Fox |
10/14/68 |
Design of an 800 MeV/c Separated Beam II |
19 |
J. Fox |
09/12/68 |
Production of Muons by Proton Scraping in the
Slow External Beam |
18 |
L. Filler |
08/26/68 |
Design of Three Bending Magnets for Use With
Beam From Target To Eight-Inch Pipe |
17 |
T. E. Toohig |
07/11/68 |
A Schematic Outline of the Extension of the
SEB Into the new East Experimental Hall |
16 |
T. E. Toohig |
06/26/68 |
Beam Sharing Compatibility Between Internal
and External Targets at the AGS |
15 |
J. R. Sanford |
06/17/68 |
Experimental Planning and Support Division
CY67 |
14 |
T. E. Toohig |
06/13/68 |
On Secondary Particle Production from an EPB
Target |
13 |
T. E. Toohig |
04/18/68 |
A Possible Muon Channel at the AGS and Its
Relevance To a Phase III Muon Channel at NAL |
12 |
L. H. Redmond, W. R.
Huebsch |
04/5/68 |
Comparative Testing of NIM Discriminators
EG&G-TR204, Chronetics-151 and LRS-161 |
11 |
J. Sanford |
01/17/68 |
Post-Conversion Research Facilities |
10 |
J. Sullivan |
12/04/67 |
AGS Substation - (Addendum I,
dated 7/27/79) |
9 |
T. Toohig |
10/30/67 |
The Beam Dump in the Slow External Proton
Beam (SEB) Experimental Area at the AGS |
8 |
T. Toohig |
09/06/67 |
Calculations for the Backstop and Shielding
for the Slow External Proton Beam (SEB) at the AGS |
7 |
J. D. Fox |
07/19/67 |
Design of an 800 MeV/c Separated Beam to be
Operated With the Slow External Proton Beam |
6 |
H. Brown |
06/20/67 |
Description and Use of Separated Beam 1a to
the 31-in Bubble Chamber |
5 |
J. R. Sanford |
05/18/67 |
G-10 Target |
4 |
A. L. Read, R. Rubinstein |
05/18/67 |
2-3 GeV/c Particle Beams from the G-10 4.7o
Beam at the Brookhaven AGS |
3 |
J. R. Sanford |
04/12/67 |
Technical Program in FY66 |
2 |
A. L. Read |
03/10/67 |
The G-10 + 4.7o Pion Beam (4-16
Gev/c) at the Brookhaven AGS |
1 |
H. Foelsche |
03/27/67 |
Shorter Separators for Beam 3 |
BNL-22610 |
C. L. Wang |
unknown |
Empirical Formula for Inclusive Proton
Spectra Between 10 and 300 GeV |
JRS/CLW-1 |
J. R. Sanford, C. L. Wang |
03/01/67 |
Empirical Formulas for Particle Production in
P-Be Collision Between 10 and 35 BeV/c - Part 1 |
JRS/CLW-2 |
J. R. Sanford, C. L. Wang |
05/01/67 |
Empirical Formulas for Particle Production in
P-Be Collision Between 10 and 35 BeV/c - Part 2 |
Internal Report |
G.T.Danby |
12/26/61 |
Magnetic
Measurements of AGS Experimental Magnets |
Internal Report |
G.T.Danby, J.W.Jackson |
12/02/63 |
Magnetic
Measurements of AGS Experimental Beam Quadrupoles |
|
|
|
|
|
|
|
|