RHIC Machine/Detector Planning Meeting

 

RHIC      STAR      PHENIX      CeC

                                                          

                  RHIC                                   STAR                                         PHENIX                                            CeC                           

                                                         

 

 


                                                                                                                   Indico Meeting Link
 

BNL Home Page

C-AD Home Page

C-AD ES&F Division

BNL Physics Department

RHIC Run History

 

 

 

 


 

 

 

 


  • Off-line CNI Polarization Results

 

 

  • RHIC Retreat 2023

 

 

Links behind the C-AD firewall

Maintenance & Accelerator Support

Operations Elogs

 

Operations Wiki

 

 

 

Provided By: P. Pile

RHIC Run 12 - Summary Plots (pptx) (pdf)

RHIC Run 13 - Summary Plots (pptx) (pdf)

RHIC Run 14 - Summary Plots (pptx) (pdf)

RHIC Run 15 - Summary Plots (pptx) (pdf)

Provided By: P. Ingrassia

RHIC Run 16 - Summary Plots (pptx) (pdf)

RHIC Run 17 - Summary Plots (pptx) (pdf)

Provided By: R. Terheide

RHIC Run 18 - Summary Plots (pptx) (pdf)

RHIC Run 19 - Summary Plots (pptx) (pdf)

RHIC Run 20 - Summary Plots (pptx) (pdf)

RHIC Run 21 - Summary Plots (pptx) (pdf)

RHIC Run 22 - Summary Plots (pptx) (pdf)

RHIC Run 23 - Summary Plots (pptx) (pdf) 

RHIC Run 24 - Summary Plots (pptx) (pdf)

 

 

Purpose of this meeting

  • To discuss and promulgate policy (when needed).

Policy Statements

RHIC Run 16 Operations Plan

Experiment Beam Use Requests - 2022

RHIC RUN-18 (FY 2018-2027) Machine Projections
Full Report


 

Webpage maintained by C. McCormick (last revision 09/30/2024)