RHIC AP EXperiments Run-9

Send comments to Fulvia Pilat, pilat@bnl.gov, x3134.

Last updated: 



 

List of Beam Experiment Proposals

 

AP Experiments Run-1

Beam Experiment Proposal Form

Beam Ex Workshop 2002

AP Experiments Run-3

Remote Ops Experiments

Beam Ex Workshop 2003

AP Experiments Run-4

RHIC Run-9

Beam Ex Workshop 2004

AP Experiments Run-5

Scheduling Physicist

APEX Workshop 2005

AP Experiments Run-6

CERN Courier article   APEX Team

APEX Workshop 2006

AP Experiments Run-7

AEAC priorities Run-9

APEX Workshop 2007

Error! Hyperlink reference not valid.

RHIC Beam Experiments Policy

APEX Workshop 2008

 

 

APEX Sessions

APEX elogs

APEX Results

March 17-18 2009

Elog1  Elog2

Summary  Polarimeter-study

March 25 2009

Elog1

Summary  Polarimeter-study  DX-D0-study

March 31 – April 1 2009

Elog1  Elog2  Elog3

Summary   IR-corrections   Spin-tune-study

April 8 2009

Elog1

Summary

Overall apex PLAN for the 100 GeV run

 

 

April 28-29

Elog1 Elog2

Polarimeter-study   DA   PS-Beam-Noise   Beam-Beam-Wires

May 4 2009

Elog

Summary   DX-D0

May 12-13

Elog1 Elog2

Summary Space-charge-Beam-beam  Bunch-length-limit  Off-mom-beta-beat  Long-range-beam-beam

May 20 2009

Elog

Summary Off-momentum-beta-beat

May 26-27 2009

Elog1 Elog2

Summary  Nonlinear-chrom  Long-range-Beam-beam  DX-D0  Impedance  Linear-optics-correction  Polarimeter-studies pp94-ramp-test

June 4 2009

Elog

 

June 9-10 2009

Elog

Summary

June 16 2009

Elog

Summary

June 23-24 2009

Elog

Summary

End-of-run-studies July 4=5

Elog

Summary

 

Send comments to Fulvia Pilat, pilat@bnl.gov, x3134.

Last updated: