RHIC AP EXperiments Run-7

Send comments to Fulvia Pilat, pilat@bnl.gov, x3134.

Last updated: 



RHIC Beam Experiments Policy

List of Beam Experiment Proposals

Beam Experiment Proposal Form

AP Experiments Run-1

AEAC recommendations (spreadsheet)

Beam Ex Workshop 2002

AP Experiments Run-3

Remote Ops Experiments

Beam Ex Workshop 2003

AP Experiments Run-4

RHIC Run-7

Beam Ex Workshop 2004

AP Experiments Run-5

Scheduling Physicist

APEX Workshop 2005

AP Experiments Run-6

CERN Courier article   APEX Team

APEX Workshop 2006

 

 

APEX Sessions

APEX elogs

APEX Results

April 4, 2007 Schedule

elog

Summary   nonlinear-chrom

April 10-11, 2007 Schedule

elog1   elog2

Summary nonlinear-chrom transition-instability beam-beam-TF

April 18, 2007 Schedule

elog

Summary Beta-squeeze   Orbit-response-matrix

April 24-25 Schedule

elog

Summary nonlinear-chrom   IBS-lattice-inj    beam-beam-wires

May 2 Schedule

elog1 elog2

Summary energy-loss nonlinear-chrom beam-based-align IBS-lattice-ramp

May 8-9 Schedule

elog1  elog2

Summary nonlinear-chrom Au-77 beam-beam-wires

May 16 Schedule

elog

Summary beam-based-align  tune-drift-1 tune-drift-2

May 22-23 Schedule Schedule-2

elog

Summary  near-integer-WP  IBS-lattice  nonlinear-chrom

May 30 Schedule Schedule-2 Schedule-3

elog

Summary  near-integer-WP  Repeatability

June 5-6 Schedule  Schedule-2

elog

Summary energy-loss injection-drifts repeatability transition-instability

June 13 Schedule

elog

Summary beta-squeeze IBS-lattice energy-loss Repeatability

June 20  Schedule

elog1 elog2

Summary beam-beam-wires   IBS-lattice  PS-common-noise 

 

Send comments to Fulvia Pilat, pilat@bnl.gov, x3134.

Last updated: