Authors
|
Date of Meeting
|
APEX Presentation
|
Y. Luo, D. Xu, D. Maffei, E. Herbert, B. Salis, T. Shrey
|
July 14, 2023
|
Maximize Emittance Ratio in RHIC for EIC
|
X. Gu, G. Robert-Demolaize, Y. Hao
|
June 30, 2023
|
Machine Learning For Luminosity Maximization
|
Y. Luo, D. Xu, C. Montag, Y. Hao
|
June 30, 2023
|
Demonstrate Large Emittance Ratio in RHIC for EIC
|
I. Pinayev
|
June 30, 2023
|
BPM Test for ERL
|
M. Sangroula, C. Liu, S. Hafeez
|
June 16, 2023
|
Study Of Transverse Beam Profile With The Applied E-Field On The IPM
|
I. Pinayev
|
June 16, 2023
|
BPM Test for ERL
|
X. Gu, G. Robert-Demolaize, Y. Hao
|
June 16, 2023
|
Machine Learning For Luminosity Maximization
|
Y. Luo, D. Xu, B. Lepore, A. Houston, K. Mernick, T. Shrey
|
June 16, 2023
|
Demonstrate 10:1 Emittance Ratio in RHIC for EIC
|
M. Sangroula, C. Liu, S. Hafeez
|
May 5, 2023
|
Study Of Transverse Beam Profile With The Applied E-Field On The IPM
|
V. Schoefer
|
May 5, 2023
|
Snake Aperture Measurement for EIC Beam Screen Planning
|
X. Gu, G. Robert-Demolaize, V. Schoefer, Y. Hao, W. Fung, J. Qiang, S. Li, Y. Kan
|
May 5, 2023
|
Machine Learning for Luminosity Maximization
|
H. Huang
|
April 20, 2022
|
Spin Transparency
|
G. Robert-Demolaize
|
April 20, 2022
|
Radial Shift Studies
|
T. Tang, R. Michnoff, J. Renta
|
April 20, 2022
|
Injection Damper Test
|
H. Huang
|
April 8, 2022
|
Spin Transparency
|
G. Robert-Demolaize
|
April 8, 2022
|
Radial Shift Studies
|
H. Huang
|
March 25, 2022
|
Spin Transparency
|
M. Blaskiewicz
|
February 25, 2022
|
Instability During Debunch
|
S. Seletskiy, A. Fedotov, D. Kayran
|
February 25, 2022
|
Electron-Ion Heating Studies
|
Y. Gao, X. Gu, L. Lin, J. Morris
|
July 16, 2021
|
Machine Learning Test
|
D. Kayran, A. Fedotov, P. Inacker, K. Mernick, S. Seletskiy, H. Zhao
|
July 16, 2021
|
Effects of Ion-Electron Focusing On Cooling Performance, Ion Heating, and Lifetime
|
Y. Luo, D. Xu, A. Marusic, T. Shrey, P. Adams, I. Blackler, M. Minty, H. Lovelace III
|
July 16, 2021
|
Fine Decoupling Test for EIC
|
S. Seletskiy, D. Kayran, A. Fedotov
|
July 16, 2021
|
Coherent Excitations Experiment
|
A. Fedotov, D. Kayran, S. Seletskiy, J. Kewisch, H. Zhao, V. Schoefer, G. Robert-Demolaize, A. Marusic
|
June 25, 2021
|
Dispersive Cooling Studies
|
S. Seletskiy, D. Kayran, A. Fedotov
|
June 25, 2021
|
Coherent Excitation Studies
|
D. Kayran, A. Drees, A. Fedotov, P. Harvey, R. Hulsart, A. Marusic, P. Thieberger, S. Seletskiy
|
June 25, 2021
|
Recombination Studies
|
Y. Luo, D. Xu, A. Marusic, I. Blackler, E. Herbert, W. Jackson, T. Shrey
|
June 4, 2021
|
Fine Decoupling Test for EIC
|
G. Robert-Demolaize
|
May 21, 2021
|
Radial Shift Studies
|
S. Seletskiy, A. Fedotov, D. Kayran
|
May 4, 2021
|
Electron-Ion Heating Studies
|
D. Kayran, A. Drees, A. Fedotov, P. Harvey, R. Hulsart, P. Thieberger, S. Seletskiy
|
May 4, 2021
|
Recombination Studies
|
G. Robert-Demolaize
|
May 4, 2021
|
Radial Shift Studies
|
S. Seletskiy, A. Fedotov, D. Kayran
|
April 30, 2021
|
Electron-Ion Heating Studies
|
Y. Gao, X. Gu, J. Morris, L. Lin
|
April 30, 2021
|
Machine Learning Test
|
D. Kayran, A. Drees, A. Fedotov, R. Hulsart, P. Thieberger, S. Seletskiy
|
April 23, 2021
|
Recombination Studies
|
D. Kayran, A. Fedotov, P. Inacker, K. Mernick, S. Seletskiy, H. Zhao
|
April 23, 2021
|
Off Center Operation
|
A. Fedotov, H. Zhao, D. Kayran, S. Seletskiy, J. Kewisch, V. Schoefer, G. Robert-Demolaize
|
April 23, 2021
|
Dispersive Cooling Studies
|
X. Gu, A. Fedotov, D. Kayran
|
April 19, 2021
|
RHIC Operation Analysis
|
S. Seletskiy, A. Fedotov, D. Kayran
|
April 9, 2021
|
Electron-Ion Heating Studies
|
S. Seletskiy, D. Kayran, A. Fedotov
|
March 26, 2021
|
Electron-Ion Heating Studies
|
G. Robert-Demolaize
|
March 14, 2021
|
Radial Shift Studies
|
S. Seletskiy, D. Kayran, A. Fedotov
|
March 10, 2021
|
Electron-Ion Heating Studies
|
S. Seletskiy, D. Kayran, A. Fedotov
|
February 25, 2021
|
Electron-Ion Heating Studies
|
S. Seletskiy, D. Kayran, A. Fedotov
|
February 12, 2021
|
Electron-Ion Heating at LEReC
|
Y. Gao
|
February 12, 2021
|
Bayesian Optimization To Improve Cooling Rate in LEReC
|
G. Robert-Demolaize
|
January 13, 2021
|
Radial Shift Studies
|
X. Gu, W. Fischer, A. Marusic, G. Stancari, G. Robert-Demolaize, A. Drees, C. Liu, M. Minty
|
July 11, 2019
|
Experiment Results of RHIC Hollow Electron Lens
|
N. Tsoupas, M. Blaskiewicz, Y. Luo, F. Meot, C. Montag, V. Ptitsyn, S. Tepikian
|
July 10, 2019
|
AtR to Yellow Injection of 330 Hadron Bunches For eRHIC
|
X. Gu, W. Fischer, G. Stancari, A. Drees, H. Garcia Morales, M. Minty
|
May 23, 2018
|
Elens Related Beam Studies
|
C. Liu, P. Thieberger, A. Marusic
|
May 23, 2018
|
New Magnet Cycle Beam Study
|
Y. Luo, A. Marusic, H. Lovelace III
|
May 9, 2018
|
Coupling Beam Transfer Function (BTF) Measurement
|
X. Gu, W. Fischer, A. Drees, M. Minty, S. Tepikian
|
May 9, 2018
|
Elens Related Beam Studies
|
Y. Luo, M. Minty, A. Marusic
|
April 11, 2018
|
Coupling Beam Transfer Function (BTF) Measurement
|
X. Gu, W. Fischer, P. Thieberger, T. Miller, Z. Altinbas, M. Minty
|
April 11, 2018
|
Elens Related Beam Studies
|
Y. Luo, M. Blaskiewicz, A. Marusic, M. Minty
|
April 11, 2018
|
Emittance Exchange Measurement With Fine Decoupling
|
C. Liu, M. Minty
|
April 11, 2018
|
Effect of LEReC 180 Degree Dipole on RHIC Ion Beam
|
C. Liu, P. Thieberger, A. Marusic, V. Schoefer, D. Bruno, Y. Luo, M. Minty
|
March 28, 2018
|
New Magnet Cycle Beam Study
|
X. Gu, W. Fischer, P. Thieberger
|
March 28, 2018
|
Elens Related Beam Study
|
Y. Luo, M. Minty
|
March 28, 2018
|
Coupling Beam Transfer Function (BTF) Measurement
|
V. Ranjbar, A. Marusic, H. Huang
|
July 7, 2017
|
Spin Tilt Study
|
H. Huang, F.Meot, P. Oddo, C. Liu, A. Marusic, V. Ranjbar, B. Schmidke
|
July 7, 2017
|
Spin Flipper at Store
|
C. Montag
|
June 9, 2017
|
Flat Beam Test
|
H. Huang, P. Oddo, C. Liu, A. Marusic, V. Ranjbar
|
June 2, 2017
|
Spin Flipper at Store
|
V. Ranjbar, H. Huang, A. Marusic, F. Meot
|
May 26, 2017
|
Polarization Scan of NU+393 Spin Resonance
|
C. Montag
|
May 26, 2017
|
Flat Beam Test
|
M. Blaskiewicz, K. Mernick
|
May 26, 2017
|
Impedance Measurement
|
H. Huang, P. Oddo, C. Liu, A. Marusic, F. Meot, V. Ranjbar
|
May 26, 2017
|
Spin Flipper at Injection
|
H. Huang, P. Oddo, C. Liu, A. Marusic, F. Meot, V. Ranjbar
|
May 5, 2017
|
Spin Tunemeter at Injection
|
H. Huang, P. Oddo, C. Liu, A. Marusic, F. Meot, V. Ranjbar
|
April 21, 2017
|
Spin Tunemeter at Injection
|
H. Huang, P. Oddo, C. Liu, A. Marusic, V. Ranjbar
|
April 7, 2017
|
Spin Tunemeter at Injection
|
X. Gu, W. Fischer, A. Marusic, G. Robert-Demolaize
|
April 7, 2017
|
Elens Related Beam Study
|
X. Gu, W. Fischer, A. Marusic, G. Robert-Demolaize
|
March 24, 2017
|
Elens Related Beam Study
|
C. Liu
|
March 24, 2017
|
Fighting Instability by Modulating
Sextupoles
|
P. Oddo
|
March 24, 2017
|
AC Dipole Orbit Closure
|
H. Huang, V. Ranjbar, A. Marusic, F. Meot
|
March 24, 2017
|
Spin Tilt Study
|
X. Gu, W. Fischer
|
June 4, 2016
|
Elens Related Beam Study
|
I. Pinayev
|
May 20, 2016
|
Propagation of the Electron Beam to High Power Beam Dump
|
G. Wang, G. Robert-Demolaize, A. Marusic
|
May 2, 2016
|
20GeV Au Ramp Development (CEC)
|
H. Huang
|
April 29, 2016
|
Polarimeter Noise Study
|
A. Marusic, V. Ptitsyn, G. Robert-Demolaize
|
April 29, 2016
|
Circumference Lengthening
|
I. Pinayev, R. Michnoff, Z. Sorrell
|
April 29, 2016
|
Calibration of the CeC PoP BPMs
|
G. Robert-Demolaize, A. Marusic
|
April 29, 2016
|
Beta* Squeeze
|
I. Pinayev, R. Michnoff, Z. Sorrell
|
April 15, 2016
|
Calibration of the CeC PoP BPMs
|
C. Liu, A. Marusic, Y. Luo,V. Ranjbar, G. Robert-Demolaize, M. Minty
|
April 15, 2016
|
Lumi Leveling with Crossing Angle
|
Y. Hao, Y. Luo, A. Marusic, V. Ptitsyn, G. Robert-Demolaize
|
March 11, 2016
|
Circumference Lengthening
|
C. Liu, A. Marusic
|
March 11, 2016
|
IR2 Physical Aperture for d-Au
|
C. Montag, A. Drees, G. Robert-Demolaize, A. Marusic
|
March 11, 2016
|
Improving the Luminosity at Injection Energy
|
G. Wang, I. Pinayev, G. Robert-Demolaize, A. Marusic
|
March 4, 2016
|
APEX on Benchmarking Longitudinal IBS at 40GeV
|
C. Liu, M. Minty
|
March 4, 2016
|
Weighted 10Hz Feedback for Better Orbit Stability at IR2
|
I. Pinayev
|
February 26, 2016
|
Study of CeC PoP Equipment Effect on the RHIC Beam
|
Y. Hao, Y. Luo, A. Marusic, V. Ptitsyn, G. Robert-Demolaize, D. Trbojevic
|
February 26, 2016
|
Circumference Lengthening
|
C. Liu, A. Marusic
|
February 26, 2016
|
Aperture Studies for dAu
|
I. Pinayev
|
February 19, 2016
|
Study of CeC PoP Equipment Effect on the RHIC Beam
|
I. Pinayev
|
February 12, 2016
|
Study of CeC PoP Equipment Effect on the RHIC Beam
|
C. Liu, Y. Luo, A. Marusic
|
February 12, 2016
|
IR2 Aperture Study
|
C. Montag
|
May 22, 2015
|
STAR Target Test
|
A. Drees, C. Montag, P. Thieberger
|
May 22, 2015
|
Pin Diode Rate Calibration
|
C. Liu
|
May 22, 2015
|
PHENIX Crossing Angle
|
S. Tepikian
|
May 22, 2015
|
IP Coupled Matrix
|
W. Fischer, Y Luo, P. Thieberger, C. Liu, A. Marusic, X. Gu
|
May 22, 2015
|
E-lens Related Beam-Beam Experiment
|
C. Montag
|
May 22, 2015
|
Aperture Test for Low Energy Asymmetric Runs
|
A. Marusic, W. Fischer, Y. Luo
|
April 24, 2015
|
3Qy Resonance Stopband Measurement
|
W. Fischer, Y. Luo, X. Gu
|
April 24, 2015
|
E-lens Related Beam-Beam Experiment
|
S. Tepekian
|
April 24, 2015
|
4x4 Matrix
|
G. Robert-Demolaize
|
April 10, 2015
|
Collimator Scans
|
A. Marusic, C. Harper, W. Fischer, Y. Luo
|
April 10, 2015
|
3Qy Resonance Stapband Measurement
|
W. Fischer, Y. Luo, X. Gu
|
April 10, 2015
|
E-lens Related Beam-Beam Experiment
|
V. Ptitsyn, S. Brooks, Y. Hao, N. Kling, A. Marusic, G. Robert-Demolaize, D. Trbojevic
|
April 10, 2015
|
Circumference Lengthening
|
K. Mernick, V. Shiltsev, C. Tambasco, A. Marusic, P. Thieberger, M. Minty, W. Fischer, Y. Luo, X. Gu
|
March 27, 2015
|
E-lens Related Beam-Beam Experiment
|
M. Blaskiewicz
|
March 27, 2015
|
RHIC Transverse Impedance Measurement
|
V. Ptitsyn, Y. Hao, A. Marusic, G. Robert-Demolaize, T. Roser, D. Trbojevic
|
March 27, 2015
|
Circumference Lengthening
|
X. Gu
|
March 13, 2015
|
E-lens Related Beam-Beam Experiment
|
S. Belomestnykh, M. Blaskiewicz, T. Hayes, K. Mernick, F. Severino, K. Smith, Q. Wu
|
March 13, 2015
|
56MHz SRF Cavity HOM Study
|
V. Ptitsyn, S. Brooks, Y. Hao, A. Marusic, G. Robert-Demolaize, D. Trbojevic
|
March 13, 2015
|
Circumference Lengthening
|
A. Drees, W. Fischer, Y. Luo, P. Thieberger, X. Gu
|
March 6, 2015
|
Elens Related Beam-Beam Experiment
|
S. Belomestnykh, M. Blaskiewicz, J. M. Brennan, T. Hayes, K. Mernick, G. Narayan, F. Severino, K. Smith, Q. Wu
|
March 6, 2015
|
56MHz RF Cavity Commissioning for Runs 14 and 15
|
M. Minty
|
March 6, 2015
|
Emittance Growth and Electron Clouds
|
A. Marusic, Y. Luo
|
March 6, 2015
|
3rd Order Resonance Stopband Measurement
|
A. Marusic, G. Robert-Demolaize, Y. Luo
|
February 27, 2015
|
Coupling and Optics Measurement at Store
|
V. Ptitsyn, S. Brooks, Y. Hao
|
February 27, 2015
|
Circumference Lengthening
|
H. Huan, D. Steski, A.Zelenski
|
February 27, 2015
|
RHIC Polarimeter Target Test
|
A. Marusic, Y. Luo, C. Liu
|
February 13, 2015
|
IR Bump Scan
|
A. Marusic, Y. Luo, C. Liu
|
February 13, 2015
|
DX Aperture Measurement
|
Y. Hao, G. Robert-Demolaize, A. Marusic, Y. Luo, S. White, Z. Duan, M. Bai
|
June 6, 2014
|
S* Control at IP8
|
C. Montag, M. Blaskiewicz, V. Schoefer, I. Blackler, A. Marusic, T. Shrey
|
June 6, 2014
|
p-Au Ramp Test
|
S. Tepikian
|
June 6, 2014
|
Coupling Matrix Measurement
|
M. Blaskiewicz, W. Fischer, X. Gu, Y. Hao, Y. Luo, S. White
|
June 6, 2014
|
Asymmetric Beam-Beam Experiment
|
S. Tepikian
|
May 23, 2014
|
Coupling Matrix Measurement
|
W. Fischer, X. Gu, Y. Luo, V. Pikin, P. Thieberger, S. White
|
May 23, 2014
|
Elens Commissioning
|
M. Blaskiewicz, W. Fischer, S. White, Y. Luo
|
May 23, 2014
|
Asymmetric Beam-Beam Interaction
|
A. Marusic, S. Tepikian, M. Bai
|
May 9, 2014
|
Store Triplet Aperture at IP8
|
Y. Hao, M. Bai, G. Robert-Demolaize, A. Marusic, S. White, Z. Duan, Y. Luo
|
May 9, 2014
|
S* Control at IP8
|
Y. Luo, A. Marusic, C. Liu, M. Minty
|
May 9, 2014
|
Off-Momentum Beta-beat Correction
|
Y. Luo
|
May 9, 2014
|
Beta* and S* Measurement with Q1 Strength Knobbing
|
S. Tepikian
|
May 9, 2014
|
Coupling Matrix Measurement
|
C. Liu, M. Minty, A. Marusic
|
May 9, 2014
|
Implementation of Ramp Optics Corrections for Both Rings
|
M. Blaskiewicz
|
May 2, 2014
|
Modulating Tunes
|
W. Fischer, X. Gu, Y. Luo, V. Pikin, P. Thieberger, S. White
|
May 2, 2014
|
Elens Commissioning
|
A. Marusic, M. Bai, S. White, S. Tepikian, Y. Luo
|
April 23, 2014
|
DX Aperture Measurement
|
G. Robert-Demolaize, M. Bai, C. Harper, A. Marusic, X. Shen, S. White
|
April 23, 2014
|
Dynamic Beta* Squeeze
|
C. Liu, M. Minty, A. Marusic
|
April 23, 2014
|
Ramp Optics Correction
|
M. Bai, Y. Hao, G. Robert-Demolaize, S. White, X. Shen, Z. Duan
|
April 23, 2014
|
S* Knob
|
M. Bai, S. Tepikian, A. Marusic, V. Litvinenko, V. Ptitsyn, Y. Luo, M. Blaskiewicz, W. Fischer, G. Robert-Demolaize, F. Schmidt, S. White
|
April 9, 2014
|
Effect of Large Horizontal Orbit Excursion in the Triplets of IP6(2)
|
A. Marusic, M. Bai, M. Minty, S. White, Y. Luo
|
April 9, 2014
|
Momentum Aperture Measurment
|
G. Robert-Demolaize, M. Bai, C. Harper, A. Marusic, X. Shen, S. White
|
April 9, 2014
|
THOR Commissioning
|
X. Gu, W. Fisher, Y. Luo, V. Pikin, P. Thieberger, S. White
|
April 9, 2014
|
Elens Commissioning
|
C. Montag
|
April 9, 2014
|
Dynamic Aperture Measurments at Injection
|
M. Bai, P. Oddo, A. Marusic
|
March 26, 2014
|
Vertical AC Dipole Setup
|
G. Robert-Demolaize, A. Marusic, C. Harper, X. Shen, Y. Luo, M. Bai
|
March 26, 2014
|
First ATS Attempt
|
S. Tepikian
|
March 26, 2014
|
APEX Twiss Coupling
|
X. Gu, W. Fisher, Y. Luo V. Pikin, P. Thieberger, S. White
|
March 26, 2014
|
Elens Commissioning
|
Y. Luo, A. Marusic, C. Harper, C. Liu, G. Robert-Demolaize, M. Bai, M. Minty
|
March 26, 2014
|
Momentum Aperture Measurement
|
A. Marusic, M. Bai, S. White, S. Tepikian, Y. Luo
|
March 26, 2014
|
DX Physical Aperture Measurement
|
C. Liu, M. Minty, A. Marusic
|
May 17, 2013
|
Observations During Ramp Optics Correction
|
H. Huang, A. Zelenski
|
May 3, 2013
|
RHIC and AGS Polarization Comparison
|
X. Shen, M. Bai, G. Robert-Demolaize, S. White, Y. Luo, S. Tepikian
|
May 3, 2013
|
Beta-Beat Correction for RHIC
|
C. Montag
|
May 1, 2013
|
Collimator Study
|
N. Biancacci, M. Blaskiewicz, C. Liu, M. Minty, K. Mernick, C. Montag, S. White
|
May 1, 2013
|
Transverse Impedance Measurements on 01-05-2013
|
X. Shen, M. Bai, G. Robert-Demolaize, S. White, Y. Luo, S. Tepikian
|
April 26, 2013
|
Beta-Beat Correction For RHIC
|
N. Biancacci
|
April 26, 2013
|
Transverse Impedance Localization Measurements at CERN
|
P. Gorgen
|
April 26, 2013
|
Beam-Beam BTF Study
|
C. Liu, A. Marusic, M. Minty
|
April 26, 2013
|
Ramp and Store Optics Corrections
|
N. Biancacci, M. Blaskiewicz, C. Liu, M. Minty, K. Mernick, C. Montag, S. White
|
April 26, 2013
|
Transverse Impedance Measurements on 24-04-2013
|
Y. Luo, S. White, Paul, Nicolo
|
April 25, 2013
|
Beam-Beam Experiment
|
C. Liu
|
April 12, 2013
|
Optics Correction At Store and Optics Measurement on the Ramp
|
J. Beebe-Wang, C. M. Zimmer
|
April 10, 2013
|
BBA Measurement, Analysis, and Application Development
|
Y. Luo, A. Marusic, S. Tepikian
|
April 10, 2013
|
Summary of DX Aperture Measurement
|
M. Bai, Y. Luo, S. White
|
April 10, 2013
|
3Qx,y Correction at Injection
|
C. Liu, M. Minty
|
March 29, 2013
|
Phase Measurement and Correction at Injection
|
Y. Luo, A. Marusic, S. Tepikian
|
March 27, 2013
|
DX Aperture Measurement
|
V. Ranjbar, M. Bai, V. Ptitsyn, I. Blackler, T. Summers
|
July 24, 2012
|
APEX Proposal to Excite Imperfection Resonance on 250GeV Ramp
|
A. Marusic
|
July 24, 2012
|
Local Coupling Measurement and Correction
|
J. Beebe-Wang, J. Ziegler
|
June 22, 2012
|
RHIC BBA Measurement, Analysis, and Related Issues
|
|
June 22, 2012
|
APEX Twiss Coupling
|
J. Beebe-Wang, J. Ziegler
|
June 13, 2012
|
RHIC BBA Measurement, Analysis, and Related Issues
|
V. Ranjbar
|
June 13, 2012
|
Head-Tail Chromaticity Measurement Using a 3D-BBQ Revisited
|
|
June 8, 2012
|
4x4 Transfer Matrix
|
|
June 8, 2012
|
Spin Flipper
|
C. Liu, Y. Luo, M. Minty
|
May 30, 2012
|
Simultaneous Global Coupling and Vertical Dispersion Correction
|
J. Beebe-Wang, J. Ziegler
|
May 30, 2012
|
RHIC BBA Measurement, Analysis, and Related Issues
|
|
May 30, 2012
|
CEC POP APEX
|
|
May 18, 2012
|
APEX Twiss Coupling
|
J. Beebe-Wang, J. Ziegler
|
May 18, 2012
|
RHIC BBA Measurement and BPM Offset Installation
|
Y. Luo, M. Bai, M. Blaskiewicz, W. Fischer, A. Marusic
|
May 4, 2012
|
Measuring Maximum Momentum Aperture
|
J. Beebe-Wang, J. Ziegler
|
May 4, 2012
|
RHIC BBA Measurement, Analysis, and Related Issues
|
M. Bai, S. White, Glenn, G. Robert-Demolaize, Joe
|
April 20, 2012
|
Blue 255GeV Optics Corrections and Measurement
|
A. Fedotov
|
April 20, 2012
|
IBS (Protons at Store)
|
A. Fedotov
|
April 4, 2012
|
Interplay of Space-Charge and Beam-Beam Effects (With Protons)
|
T. Summers, J. Kewisch
|
April 4, 2012
|
ORM
|
|
April 4, 2012
|
APEX Twiss Coupling
|
C. Montag
|
April 4, 2012
|
Horizontal Tunes
|
M. Bai, S. White, Glenn, G. Robert-Denolaize, Joe
|
April 4, 2012
|
RUN12 255GeV Optics Measurement and Analysis
|
Y. Luo, M. Bai, P. Harvey, A. Marusic, K. Mernick, M. Minty, M. Wilinski, S. White
|
April 4, 2012
|
Off-Momentum Beta-Beat Corrections
|
S. White
|
April 4, 2012
|
Beam-Beam Studies
|
V. Ranjbar, M. Bai, V. Ptitsyn, I. Blackler, T. Summers, A. Marusic, G. Robert-Demolaize, K. Yip
|
April 4, 2012
|
APEX Proposal to Excite Imperfection Resonance on 250GeV Ramp
|
J. Beebe-Wang, J. Ziegler, A. Marusic
|
April 4, 2012
|
RHIC BBA Measurement, Analysis, and Related Issues
|
Y. Luo, M. Bai, K. Mernick, M. Wilinski, S. White
|
March 30, 2012
|
Off-Momentum Beta-Beat Correction
|
|
March 30, 2012
|
Horizontal Coherent Modes Investigation
|
M. Bai, A. Marusic, S. Tepikian, C. Zimmer, Ian, Sean, Dave
|
March 30, 2012
|
Effect of 11/16 on Polarization Lifetime Without Collision
|
S. White
|
March 30, 2012
|
Coherent Modes
|
M. Bai, A. Marusic, S. Tepikian, C. Zimmer, Ian, Sean, Dave
|
March 30, 2012
|
Development of pp12b-v4
|
Y. Luo, A. Marusic, M. Bai, S. White
|
February 24, 2012
|
Nonlinear Chromaticity and Beta-Beat Correction
|
C. Liu, Y. Luo, M. Minty, A. Marusic
|
February 24, 2012
|
New Global DeCoupling Scheme
|
M. Bai, S.White, Glenn, G. Robert-Demolaize, Joe
|
February 24, 2012
|
RUN12 100GeV Optics Measurement and Analysis
|
|
February 24, 2012
|
Tune Scans/Pi Mode Suppression
|
|
February 24, 2012
|
Measure Twiss and Coupling at IP
|
|
May 25, 2011
|
APEX for CeC Optics Development
|
|
May 25, 2011
|
BBA Plan for 05/02/2011 (Preliminary)
|
|
May 25, 2011
|
10 Hz Global Orbit Feedback First Ramp Test Results
|
Y. Luo, A. Marusic, M. Minty, C. Liu
|
May 25, 2011
|
Beta* Measurement with Q1 Strength Modulation
|
C. Liu, M. Minty, R. Michnoff, R. Hulsart, K. Mernick, P. Thieberger, P. Cerniglia
|
May 11, 2011
|
10 Hz GOFB with Measured ORM
|
R. Connolly, M. Minty, S. Tepikian
|
May 11, 2011
|
Calibration Scans on IPMs
|
M. Bai, R. Calaga, Y. Luo, S. White
|
May 11, 2011
|
Status Report on Chromatics Optics Measurements and Correction
|
|
May 11, 2011
|
Measure Twiss and Coupling
|
M. Bai, M. Brennan, C. Dawson, R. Hulsart, Y. Makdisi, P. Oddo, C. Pai, P. Pile, P. Rosas, T. Rosas
|
May 11, 2011
|
RHIC Spin Flipper Commissioning
|
Y. Luo, M. Bai
|
May 11, 2011
|
Correct Off-Momentum Beta*-Beat
|
J. Ziegler, C. Liu, M. Minty
|
May 6, 2011
|
Recent History of BBA at RHIC
|
M. Bai, M. Brennan, C. Dawson, Y. Makdisi, P. Oddo, C. Pai, P. Pile, P. Rosas, T. Roser
|
May 6, 2011
|
RHIC Spin Flipper Commissioning
|
C. Liu, V. Ptitsyn, M. Minty
|
May 6, 2011
|
First Turn SVD Orbit Correction
|
A. Fedotov
|
May 6, 2011
|
Interplay of Space-Charge and Beam-Beam Effects
|
M. Bai, M. Brennan, C. Dawson, Y. Makdisi, O. Oddo, C. Pai, P. Pile, P. Rosas, T. Roser
|
April 29, 2011
|
RHIC Spin Flipper Commissioning
|
|
April 29, 2011
|
Measure Twiss and Coupling at IP
|
G. Robert-Demolaize, M. Bai, A. Marusic, S. Tepikian
|
February 23, 2011
|
Beta* Gymnastics
|
M. Blaskiewicz, M. Bai, A. Fedotov, W. Fischer, M. Minty, G. Wang
|
May 7, 2010
|
Beam Lifetime Study for Low Energy Run
|
C. Montag
|
April 30, 2010
|
Determining the Betatron Phase Measurement Precision of the AC Dipole Method
|
Y. Luo, D. Trbojevic
|
January 29, 2010
|
Second Order Chromaticity Correction for Au104
|
M. Bai, G. Wang
|
January 29, 2010
|
Blue Horizontal Beta* Measurement for Au104 Using AC Dipole
|
G. Robert-Demolaize
|
January 29, 2010
|
Run10 APEX- Beta* Squeeze
|
A. Marusic, R. Michnoff, M. Minty, V. Ptitsyn, G. Robert-Demolaize, T. Satogata
|
January 29, 2010
|
RHIC Continuous Orbit Feedback (01/27/10)
|
M. Bai, V. Ptitsyn, T. Roser
|
January 22, 2010
|
Snake Orbit Effect on the Spin Tune in RHIC
|
Y. Luo
|
January 22, 2010
|
Second Order Chromaticity Correction at Blue Store
|
M. Bai, G. Wang
|
January 22, 2010
|
Measurements of Beta* in Store for RHIC Run-10 Using AC Dipole
|
V. Ptitsyn
|
January 15, 2010
|
Beta* and s* Measurements for Ramp Au102
|
V. Ptitsyn
|
January 6, 2010
|
Disperion Measurements
|
D. Trbojevic
|
January 28, 2008
|
Report from Experiment on January 28, 2008: Au77+ in RHIC
|