Low Energy RHIC electron Cooling Project Website

Project Contact: A. Fedotov x5479 (Manager) / J. Tuozzolo x3966 (Engineer)

REVIEWS | LEReC MEETINGS | WHITE PAPER | PROJECT MATERIAL | TECHNICAL PAPER | PROGRESS UPDATESSHUTDOWN SCHEDULE

BNL Home page C-AD Home page Accelerator Division Accelerator R&D Division ES&F Division
         
Main Contacts Listed by Group:
ESSHQ.....................................................
Project Controls........................................
Electrical Lead Engineer.............................
Mechanical Lead Engineer..........................
Beam Dynamics & Accelerator Physics......
Cathodes...................................................
Cathode Insertion System...........................
SRF cavity.................................................
Warm RF Cavity........................................
Cavities Mechanical....................................
RF Systems PS & LLRF............................
Laser.........................................................
Beam Diagnostics.......................................
Magnets.....................................................
Power Supplies..........................................
Vacuum Systems........................................
Cryogenics.................................................
Controls.....................................................
Beam Dump...............................................
Commissioning...........................................
Operation Integration..................................
DC Gun Electrical......................................
DC Gun Mechanical...................................
DC Gun Physics.........................................
Machine Protection System.........................
Facilities Support........................................
E. Lessard; P. Cirnigliaro
K. Mirabella, K. Williams, R. VanWormer
D. Bruno
J. Tuozzolo
J. Kewisch, D. Kayran, M. Blaskiewicz, A. Fedotov, S. Seletskiy
T. Rao, E. Wang
C.J. Liaw
K. Smith, G. McIntyre, W. Xu
J. Brennan, B. Xiao
C. Brutus
A. Zaltsman; K. Mernick
Z. Zhao, P. Inacker, M. Minty
T. MillerD. Gassner, P. Thieberger, C. Liu, M. Minty
G. Mahler, H. Witte
D. Bruno, J. Sandberg
M. Mapes, D. Weiss
R. Than
J. Jamilkowski, M. Costanzo
J. Fite
D. Kayran, A. Fedotov, S. Seletskiy
L. Hammons
J. Sandberg, D. Bruno
C.J. Liaw
X. Gu
S. Seletskiy, Z. Altinbas
C. Folz
 *Org. Chart*
Subsystems Links
Instrumentation Components
(Behind Firewall)
Controls
(Behind Firewall)
Cryogenics Systems     Project Management
(Behind Firewall)

LEReC RF Systems

(Behind Firewall)

Commissioning & Tests ESSHQ    

 

 

Reviews

(Firefox or Google Chrome are the preferred browsers for Indico)

(Please contact A. Petway or C. Hoffman for the access key, please reference the exact review you are trying to access)

DOE Annual Progess Review of Low-Energy RHIC electron Cooling (LEReC), November 14-15,2017

Annual LEReC DOE Review, November 16 - 17, 2016

DOE Mini Review of Low-Energy RHIC electron Cooloing (LEReC), April 11, 2016  

DOE Review of Low Energy RHIC electron Cooling (LEReC), November 4-5, 2015

Low Energy RHIC electron Cooling (LEReC) Technical, Cost, Schedule, and Management Review, January 12-13, 2015

Low Energy RHIC electron Cooling (LEReC) Technical, Cost, Schedule, and Management Review, July 9-11, 2014

Accelerator Physics Review of Low Energy RHIC electron Cooling (LEReC) for RHIC, August 13-14, 2013

ASSRC Review Slides [PDF]

 

White Paper

September 19, 2013

 

Technical Papers

2016

 

Progress Updates

June 2016; July 2016; August 2016; September 2016October 2016; November 2016; December 2016;

January 2017; February 2017; March 2017; April 2017; May 2017; June 2017; July 2017; August 2017; September 2017; October 2017

 

LEReC Meetings

2013  2014 2015 2016 2017

 

Shutdown Schedule

LEReC 2017 Shutdown Schedule

 

 

This website  is maintained by: C. Hoffman/J. Tuozzolo, last revision 10/16/2017