Low Energy RHIC electron Cooling Project Website

Project Contact: A. Fedotov x5479 (Manager) / J. Tuozzolo x3966 (Engineer)

REVIEWS | LEReC MEETINGS | WHITE PAPER | PROJECT MATERIAL

BNL Home page C-AD Home page Accelerator Division Accelerator R&D Division ES&F Division
         
Systems Engineers Contacts:
Analyses & Requirements: E. Lessard
Project Controls: K. Mirabella, K. Williams, R. VanWormer
Electrical Lead Engineer: D. Bruno
Mechanical Lead Engineer: L. Snydstrup
Beam Dynamics & Accelerator Physics: J. Kewisch, D. Kayran,
M. Blaskiewicz, A. Fedotov, S. Seletskiy
Cathodes & Cathode Insertion:  T. Rao, C.J. Liaw

RF Systems:
A. Zaltsman, Head
K. Smith, Deputy
SRF: K. Smith, G. McIntyre, W. Xu
Warm RF Cavity: J. Brennan, B. Xiao
Cavities Mechanical Design: C. Brutus, C. Pai
RF Systems PS & LLRF: A. Zaltsman
Laser: Z. Zhao, B. Sheehy
Beam Diagnostics: T. MillerD. Gassner, P. Thieberger
Magnets: G. Mahler, W. Meng
Power Supplies: D. Bruno, R. Lambiase
Vacuum Systems: M. Mapes
Cryogenics: R. Than
Controls: K. Brown
Beam Dump: J. Fite
Commissioning: D. Kayran, W. Xu, A. Fedotov, S. Seletskiy
Operation Integration: L. Hammons



Subsystems Links
Instrumentation Components
(Behind Firewall)
Controls
(Behind Firewall)
Cryogenics Systems     Project Management
(Behind Firewall)

LEReC RF Systems

(Behind Firewall)

 

 

Reviews

(Firefox or Google Chrome are the preferred browsers for Indico)

DOE Mini Review of Low-Energy RHIC electron Cooloing (LEReC), April 11, 2016  (AccessCode: LEReC2016)

DOE Review of Low Energy RHIC electron Cooling (LEReC), November 4-5, 2015 (AccessCode: LEReC20152)

Low Energy RHIC electron Cooling (LEReC) Technical, Cost, Schedule, and Management Review, January 12-13, 2015 (AccessCode: LEReC2015)

Low Energy RHIC electron Cooling (LEReC) Technical, Cost, Schedule, and Management Review, July 9-11, 2014 (AccessCode: LEReC2014)

Accelerator Physics Review of Low Energy RHIC electron Cooling (LEReC) for RHIC, August 13-14, 2013

(Indico

White Paper
September 19, 2013

 

 

 


LEReC Meetings

2013  2014 2015 2016

 

2013
LEReC Kick-Off Meeting, October 4, 2013 LEReC Meeting, November 1, 2013 December
LEReC Project Planning - J. Tuozzolo [PDF] LEReC Project Planning - J. Tuozzolo [PDF]
NO MEETINGS
  LEReC Engineering - A. Fedotov [PDF] :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
LEReC Overview Meeting, October 28, 2013    
LEReC Overview [PDF] LEReC Machine Protection Interfaces & Requirements Meeting, November 5, 2013  
  Notes [PDF]  
LEReC Timing Meeting, October 31, 2013 MP - K. Brown [PDF] [PPT] :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
Notes [PDF]    
Timing/Controls - A. Fedotov [PDF] LEReC SCRF Meeting, November 6, 2013  
Controls & RF Requirements - B. Sheehy [PDF] [PPT] Notes [PDF]  
  LEReC SCRF Support - J. Tuozzolo [PDF] :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
  LEReC WBS 11 & 3.0 SCRF eGun - R. Than [PDF]  
  Tuners Status Summary at FRIB - R. Than [PDF]  

 

2014
January February March April May June
NO MEETINGS
LEReC Meeting, February 26, 2014
LEReC Meeting, March 13, 2014
LEReC Meeting, April 9, 2014
NO MEETINGS
NO MEETINGS
 
LEReC [PDF] [PPTX]
LEReC Cryogenics - A. Fedotov [PDF] [PPT]
LEReC Overview [PDF]
   
:::::::::::::::::::::::::::::::::::::: .............. LEReC Cryo - R. Than [PDF] [PPT]
LEReC II WBS [PDF] [EXCEL]
:::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::
     
Building Requirements [PDF] [EXCEL]
   
           
July August September October
November
December
NO MEETINGS
LEReC Meeting, August 21, 2014
LEReC Meeting, Sept. 5, 2014
LEReC Meeting, Oct. 29, 2014
LEReC Meeting, Nov. 5, 2014
LEReC Meeting, Dec. 4, 2014
::::::::::::::::::::::::::::::::::::::
Engineering Systems Update - J. Tuozzolo [PDF]
LEReC Section 2015 Shutdown - J. Tuozzolo [PDF]
LEReC Cooling Section Meeting Minutes - J. Tuozzolo [PDF]
LEReC Cooling Section Meeting Minutes - L. Snydstrup [PPT] [PDF]
LEReC Cooling Section Meeting Minutes - L. Snydstrup [PPT] [PDF]
          Cost Estimate - A. Fedotov [PPT] [PDF]
   
LEReC Meeting, Sept. 17, 2014
 
LEReC Meeting, Nov. 12, 2014
 
   
RHIC Cooling Sec. Beam Line Cooling Sec. Solenoid/Corrector/Vacuum Chamber mechanical design - J. Tuozzolo [PDF]
 
LEReC Cooling Section Meeting Minutes - L. Snydstrup [PPT] [PDF]
LEReC Meeting, Dec. 17, 2014
L
EReC Cooling Section Meeting Minutes - L. Snydstrup [PPT] [PDF]
           
       
LEReC Meeting, Nov. 17, 2014
LEReC Meeting, Dec. 31, 2014
       
LEReC Cooling Design Update Meeting Minutes -J. Tuozzolo [PPT] [PDF]
LEReC Cooling Design Update Meeting Minutes -J. Tuozzolo [PPT] [PDF]
           
       
LEReC Meeting, Nov. 19, 2014
 
       
LEReC Cooling Design Update Meeting Minutes -L. Snydstrup [PPT] [PDF]
 
           
       
LEReC Meeting, Nov. 26, 2014
 
       
LEReC Cooling Section Component Design Meeting Minutes -L. Snydstrup [PPT] [PDF]
 

 

 

2015
January February March April May June
LEReC Cooling Section Component Design Meeting, Jan. 7, 2015
LEReC Cooling Section Meeting, Feb. 11, 2015
LEReC Cooling Section Meeting, Mar. 11, 2015
LEReC Cooling Section Meeting, Apr. 2, 2015
LEReC Cooling Section Meeting, May 6, 2015
LEReC Meeting's, June 4, 2015
LEReC Cooling Sec. Meeting Minutes
- L. Snydstrup [PDF] [PPT]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF]
LEReC Cooling Section Meeting- J. Tuozzolo [PDF] [PPT]
LEReC Instrumentation Meeting Minutes-
 T. Miller [PDF] [DOCX] & Presentation [PDF] [PPTX]
LEReC Cooling Section Component Design Meeting, Jan. 14, 2015
LEReC Cooling Section Meeting, Feb. 18, 2015
LEReC Cooling Section Meeting, Mar. 4, 2015
LEReC Cooling Section Meeting, Apr. 8, 2015
RHIC Meeting, May 11, 2015
LEReC Cooling Sec. Meeting Minutes
- L. Snydstrup [PDF] [PPT]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Overview Presentation
- A. Fedotov [PDF]
 
       
LEReC Sector 1 Relocation Meeting, June 5, 2015
LEReC Cooling Section Meeting, Jan. 21, 2015
LEReC Cooling Section Meeting, Feb. 25, 2015
LEReC Cooling Section Meeting, Mar. 19, 2015
LEReC Cooling Section Meeting, Apr. 16, 2015
LEReC Cooling Section Meeting, May 13, 2015
Meeting Minutes
- D. Gassner [PDF] [PPTX]
Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
 Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
Meeting Minutes
- J. Tuozzolo [PDF]
 
          LEReC Cooling & Merging Sections Meeting,
June 11, 2015
   
LEReC Cooling Section Meeting, Apr. 23, 2015
LEReC Project Approval
 - Engineering & Schedule Meeting, May 20th, 2015
Meeting Minutes 
- J. Tuozzolo [PPTX] [PDF]
     
 Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
Meeting Minutes
- J. Tuozzolo[PDF] [PPT]
 
         
LEReC 2.1 GHz and 704MHz “Warm” RF Cavities - Mechanical Design Review, June 15, 2015
     
LEReC Cooling Section Meeting, Apr. 24, 2015
LEReC Sector 1 Relocation Meeting, May 22, 2015
2.1 GHz Warm RF Cavity -
- B. Xiao [PDF] [PPTX]
     
 Meeting Minutes
- C. Pai [PDF]
Meeting Minutes
- D. Gassner [PDF] [PPTX]
2.1 GHz 3-Cell Cavity -
- C. Brutus [PDF] [PPTX]
 
     
LEReC Cooling Section Meeting, Apr. 30, 2015
LEReC Meeting's, May 28, 2015
LEReC Cooling Instrumentation Meeting,
June 18, 2015
Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Warm RF Cavity Design Meeting- B. Xiao [PDF] [PPTX]
Instrumentation Presentation
 [PDF] [PPTX] / IPAC'15 Paper [PDF] - D. Gassner
        LEReC Instrumentation Meeting Minutes-
 T. Miller [PDF] [DOCX]
 
       
LEReC Cooling Sec. Meeting Minutes
- J. Tuozzolo [PDF] [PPT]
LEReC Cooling Instrumentation Meeting,
June 25, 2015
Instrumentation Development
 [PPTX] [PDF] - D. Gassner
           
          LEReC Cooling & Merging Sections Meeting,
June 25, 2015
          Meeting Minutes
 [PPTX] [PDF] - J. Tuozzolo

 

July August September October November December
LEReC Cooling Section Status Report, July 2 , 2015 / NO MEETING LEReC Cooling Section Meeting,
 Aug. 4, 2015
ERL SCRF gun to LEReC SCRF Booster Cavity Conversion Planning and Design, Sept. 1, 2015 LEReC Cooling Section Meeting,
 Oct. 1, 2015
DC gun Solenoid Beamline Meeting,
 Nov. 10, 2015
LEReC Cooling Section Meeting,
 Dec. 3, 2015
[PDF] - J. Tuozzolo Presentation [PPT] [PDF] - J. Tuozzolo Presentation [PPTX] [PDF] - K. Smith Presentation [PPT] [PDF] - J. Tuozzolo Minutes & Presentation [PPT] [PDF]
- J. Tuozzolo
Presentation [PPT] [PDF] - J. Tuozzolo
Notes [PDF] - K. Smith LEReC Instrumentation Planning Meeting, Oct. 1, 2015 LEReC Transport Meeting,
 Nov. 10, 2015
 
LEReC 704MHz "Warm" RF Cavities -Mechanical Design Review II, July 9, 2015 LEReC Cooling Section Meeting,
Aug. 13, 2015
Presentation [PPTX] [PDF] - T. Miller Presentation [PPT] [PDF]
- J. Tuozzolo
LEReC GtBC Section Meeting,
 Dec. 11, 2015
Presentation [PPTX] [PDF] - C. Brutus Presentation [PPT] [PDF] - J. Tuozzolo LEReC Cooling Section Meeting,
Sept. 3, 2015
    Presentation [PPT] [PDF]
- J. Tuozzolo
Presentation [PPTX] [PDF] - B. Xiao   Presentation [PPT] [PDF] - J. Tuozzolo LEReC Magnetic Measurement for 2015 installation, Oct. 6, 2015
LEReC Instrumentation Planning Meeting, Nov. 12, 2015
 
Minutes & Presentation [PPTX] [PDF]
- J. Tuozzolo/L. Snydstrup
LEReC 704MHz "Warm" RF Cavities - Mechanical Design Meeting, Aug. 20 , 2015
LEReC Instrumentation Planning Meeting, Sept. 3, 2015   Presentation [PPTX] [PDF] - T. Miller LEReC Transport Meeting,
 Dec. 17, 2015
Presentation  [PDF] - C. Brutus Presentation [PPTX] [PDF] - T. Miller   Presentation [PPT] [PDF]
- J. Tuozzolo
LEReC Instrumentation Planning Meeting, July16, 2015 Presentation [PPTX] [PDF] - B. Xiao Presentation [PPTX] [PDF] - B. Xiao LEReC Instrumentation Planning Meeting, Oct. 8, 2015 LEReC Transport Meeting,
 Nov. 23, 2015
LEReC Instrumentation Planning Meeting, Dec. 17, 2015
Presentation [PPTX] [PDF] - T. Miller LEReC Instrumentation Planning Meeting, Aug. 20, 2015   Presentation [PPTX] [PDF] - T. Miller Presentation [PPT] [PDF]
- J. Tuozzolo
Presentation [PPTX] [PDF] & Minutes 12/3&17/2015 [PDF]- T. Miller
LEReC Cooling Section Status Report, July 2 , 2015 / NO MEETING Presentation [PPTX] [PDF] - T. Miller ERL SCRF gun to LEReC SCRF Booster Cavity Conversion Planning and Design, Sept. 8, 2015    
[PDF] - J. Tuozzolo LEReC Cooling Section Meeting,
Aug. 20, 2015
Notes [PDF] - K. Smith LEReC Instrumentation Planning Meeting, Oct. 15, 2015
LEReC Instrumentation Planning Meeting, Nov. 24, 2015
LEReC Dipole Magnets Meeting, Dec. 22, 2015
LEReC Instrumentation Planning Meeting, July21, 2015 Presentation [PPT] [PDF] - J. Tuozzolo   Presentation [PPTX] [PDF] - T. Miller Presentation [PPTX] [PDF] Minutes [PDF] - T. Miller Presentation [PDF] - A. Jain
Presentation [PPTX] [PDF] - J. Tuozzolo   LEReC Cooling Section Meeting,
Sept. 10, 2015
LEReC "Warm" RF Cavity - Mechanical Design Meeting,
Oct. 15, 2015
LEReC Cooling Section Solenoid Magnetic Measurment Result Meeting,
 Nov. 24, 2015
 
  Presentation [PPT] [PDF] - J. Tuozzolo Presentation [PPTX] [PDF] - B. Xiao Presentation [PDF] - A. Jain Minutes [PDF]
- J. Tuozzolo
 
LEReC Cooling Section Meeting, July 23, 2015 LEReC Instrumentation Planning Meeting, Aug. 27, 2015        
Presentation [PPT] [PDF] - J. Tuozzolo Presentation [PPTX] [PDF] - T. Miller LEReC-DC Gun to Booster SCRF Cavity Beam Line Layout, Sept. 14, 2015 LEReC "Warm" RF Cavity - Mechanical Design Meeting,
Oct. 22, 2015
   
  Presentation [PPT] [PDF] - J. Tuozzolo Presentation [PPTX] [PDF]
Toshiba RF Window to WR1500
 - B. Xiao & C. Pai
   
LEReC 704MHz "Warm" RF Cavity - Final Design Review, July 31, 2015 LEReC Cooling Section Meeting,
Aug. 28, 2015
       
Presentation [PPTX] [PDF] - B. Xiao Presentation [PPT] [PDF] - J. Tuozzolo Results of Magnetic Measurments in LEReC Solenoid #1 (Sl. No. 16046),
Sept. 27, 2015
LEReC Accelerator Section Integration Meeting,
 Oct. 29, 2015
   
    Meeting Notes [PDF] - J. Tuozzolo Presentation [PDF] - J. Tuozzolo    
           
    LEReC Transport Line Meeting,
Sept. 22, 2015
     
    Presentation [PDF] - J. Tuozzolo      
           
    LEReC Cooling Section Meeting,
Sept. 24, 2015
     
    Presentation [PPT] [PDF] - J. Tuozzolo
Presentation [PPTX] [PDF] - T. Miller
Notes [PDF] - K. Smith
     
    LEReC "Warm" RF Cavity Mechanical Design Meeting,
Sept. 24, 2015
     
    Presentation [PPTX] [PDF] - B. Xiao      

 

2016
January February March April May June
LEReC Instrumentation Planning Meeting, Jan. 7, 2016 LEReC Booster Cavity Installation Meeting, Feb. 3, 2016 LEReC DC Gun Test Beam Line Components Meeting, Mar. 14, 2016 LEReC Booster Cavity Installation Meeting, April 7, 2016 LEReC SRF Booster Cavity/DC Gun Work Platform, Cleanroom, Waveguide Interface Meeting, May 2, 2016  
Presentation [PPTX] [PDF] - T. Miller Presentation [PPT] [PDF] - J. Tuozzolo
Beamline Cavity Installation - [PPT] [PDF] - J. Tuozzolo
Presentation [PPT] [PDF] - J. Tuozzolo Presentation [PPTX] [PDF] - J. Tuozzolo
Additional Notes [PDF] - R. Than
Presentation [PPTX] [PDF] - J. Tuozzolo  
LEReC Transport Line Meeting,
Jan. 7, 2016
 
Presentation [PPT] [PDF] - J. Tuozzolo LEReC Instrumentation Planning Meeting, Feb. 4, 2016 LEReC Instrumentation Planning Meeting, Mar. 17, 2016 LEReC Instrumentation Planning Meeting, April 14, 2016 LEReC Instrumentation Planning Meeting, May 5, 2016
  Presentation [PPTX] [PDF] - T. Miller Presentation [PPTX] [PDF] - T. Miller Presentation [PPTX] [PDF] - T. Miller
Emittance Measurement Considerations [PDF]
Presentation [PPTX] [PDF] - T. Miller  
LEReC Instrumentation Planning Meeting, Jan. 14, 2016          
Presentation [PPTX] [PDF] - T. Miller LEReC Instrumentation Planning Meeting, Feb. 11, 2016 LEReC AP Meeting on RF Studies of Booster Cavity, Mar. 23, 2016 LEReC Booster Cavity Area Layout Meeting, April 14, 2016 LEReC Work Platfrom Meeting, May 11, 2016  
Presentation [PPTX] [PDF] - T. Miller Presentation [PDF] - B. Xiao Minutes [PPTX] [PDF] - J. Tuozzolo Minutes [PPTX] [PDF] - J. Tuozzolo  
LEReC Instrumentation Planning Meeting, Jan. 21, 2016          
Presentation [PPTX] [PDF] - T. Miller LEReC Instrumentation Planning Meeting, Feb. 18, 2016 LEReC Instrumentation Planning Meeting, Mar. 24, 2016 LEReC Warm Cavity Meeting, April 20, 2016 LEReC Instrumentation Planning Meeting, May 12, 2016  
LEReC Transport Line Meeting,
Jan. 21, 2016
Presentation [PPTX] [PDF] - T. Miller Presentation [PPTX] [PDF] - T. Miller Presentation [PPTX] [PDF] - C. Pai Presentation - "Estimates of Required MPS Reaction Time" -
[PPTX] [PDF] - S. Seletski
Presentation [PPTX] [PDF] - T. Miller
Presentation [PPT] [PDF] - J. Tuozzolo       LEReC DC Gun Test Transport Line Meeting, May 12, 2016  
  LEReC Cooling Section Meeting,
Feb. 24, 2016
  LEReC MPS Meeting, April 21, 2016 Minutes [PPTX] [PDF] - J. Tuozzolo  
LEReC Transport Line Meeting,
Jan. 28, 2016
Presentation [PPT] [PDF] - J. Tuozzolo   Presentation [PPTX] [PDF] - A. Fedotov    
Presentation [PPT] [PDF] - J. Tuozzolo     LEReC Instrumentation Planning Meeting, April 21, 2016 LEReC Instrumentation Planning Meeting, May 19, 2016  
LEReC Instrumentation Planning Meeting, Jan. 28, 2016 LEReC Instrumentation Planning Meeting, Feb. 25, 2016   Presentation [PPTX] [PDF] &
Notes [PDF]- T. Miller
Presentation [PPTX] [PDF] - T. Miller  
Presentation [PPTX] [PDF] - T. Miller Presentation [PPTX] [PDF] &
 Notes [PDF] - T. Miller
Presentation [PPTX] [PDF] - R. Mitchnoff
       
      LEReC DC Gun & Electron Test Beam Line Installation, 2016 Shutdown Meeting, April 22, 2016    
      Minutes [PPTX] [PDF] - J. Tuozzolo    
           
      LEReC DC Gun Test Transport Line Meeting, April 28, 2016    
      Minutes [PPTX] [PDF] - J. Tuozzolo    

This website  is maintained by: C. Hoffman/J. Tuozzolo, last revision 05/23/2016