Collider Accelerator Department
Radiation Safety Committee Minutes
| 1996 | 1997 | 1998 | 1999 | 2000 |
| 2001 | 2002 | 2003 | 2004 | 2005 |
| 2006 | 2007 | 2008 | 2009 |
1. Meeting Date: April 3, 1996
Subject: RHIC Internal Beam Dumps - A. Stevens
2. Meeting Date: August 20, 1996
Subject: Design of STAR Shield Wall - A. Stevens
3. Meeting Date: October 22, 1996
Subject: E917 in the B1 beamline
4. Meeting Date: November 6, 1996
Subject: E896 in the C5 line with Au beam
5. Meeting Date: November 8, 1996
Subject: PASS System Specifications - A. Etkin
6. Meeting Date: November 20, 1996
Subject: RHIC 4 o'clock beam dump shielding (re-visited)
7. Meeting Date: November 25, 1996
Subject: E922 (NASA) in the C5 Beamline
8. Meeting Date: December 18, 1996
Subject: E896 "Walkway" over C5D11 during High Intensity Au Operation
9. Meeting Date: January 13, 1997
Subject: B5 Roof Shielding
10. Meeting Date: January 15, 1997
Subject: RF in the RHIC First Sextant Test
11. Meeting Date: February 4, 1997
Subject: RHIC Sextant RF Operation in "Stand-Alone" Mode
12. Meeting Date: February 13, 1997
Subject: AGS J-10 Scraper
13. Meeting Date: February 28, 1997
Subject: 921 PLC (div B) Code Change
14. Meeting Date: March 4, 1997
Subject: RF Sextant RF Operation in "Stand-Alone" Mode
15. Meeting Date: March 14, 1997
Subject: E913/E914 in the C6 Beamline
16. Meeting Date: March 28, 1997
Subject: B1 Secondary Operation with ~ 5 GeV Negative Beam
17. Meeting Date: April 24, 1997
Subject: Sub-Committee for RHIC 2 o'clock Shield Wall
18. Meeting Date: April 28, 1997
Subject: C6/C8 Intensity Limit
19. Meeting Date: May 14, 1997
Subject: B1 requested changes-Positive Secondary Operation (Part B)
B1 requested changes-Low Intensity Primary Operation (Part C)
20. Meeting Date: May 19, 1997
Subject: Low Intensity, Primary Proton Beam into the B1 Secondary Area
21. Meeting Date: August 6, 1997
Subject: Key-Tree Proposal - R. Frankel
22. Meeting Date: August 7, 1997
Subject: New Chipmunk (conceptual design review)
23. Meeting Date: September 17, 1997
Subject: CASIM vs LCS (Lahet Code System) for Neutron Dose Estimates
24. Meeting Date: October 20, 1997
Subject: PHENIX Shield Wall Design
25. Meeting Date: October 22, 1997
Subject: RHIC 2 o'clock Shield Wall
26. Meeting Date: December 3, 1997
Subject: PASS Changes for the V Target and V1 Primary Areas
27. Meeting Date: January 21, 1998
Subject: PHENIX Side Shield Wall
28. Meeting Date: January 28, 1998
Subject: C1/C3 Beamline Modifications - A. Carroll
29. Meeting Date: March 6, 1998
Subject: Modification of STAR Shield Wall Design
30. Meeting Date: March 12, 1998
Subject: RSC Review of Proposed Modifications of A Target
31. Meeting Date: March 26, 1998
Subject: E944 in the B1 beamline (Au), [also 1 shift E946 run]
32. Meeting Date: April 1, 1998
Subject: RHIC 4 o'clock Shield and Fencing
33. Meeting Date: May 28, 1998
Subject: 1) E850 in the C1 Beamline (re-visited) - A. Carroll
2) B2 Test Beam Intensity Limitation - A. Carroll
34. Meeting Date: May 29, 1998
Subject: PASS Interlock Terminology
35. Meeting Date: July 28, 1998
Subject: U Line Operations - E938 Revisit
36. Meeting Date: July 29, 1998
Subject: Shielding and Access Configuration at 12 o'clock
37. Meeting Date: August 1, 1998
Subject: Sub-Committee Review for RHIC 4 o'clock PASS
38. Meeting Date: August 18, 1998
Subject: E941 in the A3 Beam Line
39. Meeting Date: August 25, 1998
Subject: E941 in the A3 Beam Line
40. Meeting Date: September 10, 1998
Subject: Inspection of RHIC berm
41. Meeting Date: September 11, 1998
Subject: Changes for E896 in the C5 Beam Line
42. Meeting Date: September 14, 1998
Subject: 18 GeV/c Positive Beam for E941 in the A3 Beamline
43. Meeting Date: September 24, 1998
Subject: E931 in the C8 Beamline
44. Meeting Date: October 19, 1998
Subject: 10 o'clock Area, Straight Penetrations, Perimeter Fence Specifications
45. Meeting Date: November 23, 1998
Subject: RHIC RF System
46. Meeting Date: November 25 & 30, 1998
Subject: March Test Run
47. Meeting Date: December 31, 1998
Subject: Critical Device RHIC Injection Line
48. Meeting Date: January 8, 1999
Subject: ASSC PASS Subcommittee – 1008 and Peer 19 State Table Review
49. Meeting Date: January 11, 1999
Subject: Expected Radiation Doses and the Need for LTD
50. Meeting Date: February 16, 1999
Subject: U-Line Operations for E938, E945 and E945A
51. Meeting Date: February 19, 1999
Subject: Review of Pending Shielding Issues Related to RHIC
52. Meeting Date: February 26, 1999
Subject: Review of Magnet Access Shielding at 8 and 12 o’clock Areas
53. Meeting Date: March 5, 1999
Subject: Review of Collimators and Other Topics Related to RHIC Turn-On
54. Meeting Date: April 9, 1999
Subject: Planning for RHIC Commissioning
55. Meeting Date: April 16, 1999
Subject: Status of items Related to June Commissioning Run
56. Meeting Date: April 21, 1999
Subject: Planning for RHIC Commissioning, Second Meeting
57. Meeting Date: April 21, 1999
Subject: Experiment 933 U Line
58. Meeting Date: April 23, 1999
Subject: Restricting Beam Loss Beneath Uncontrolled Areas in Commissioning Run
59. Meeting Date: April 23, 1999
Subject: Meeting with RSC Liaison Physicists for RHIC Detectors
60. Meeting Date: June 17, 1999
Subject: RSC Sub-Committee – Critical Devices – RHIC
61. Meeting Date: June 22, 1999
Subject: BAF
62. Meeting Date: August 31, 1999
Subject: Reach-backs for RHIC RF
63. Meeting Date: October 6, 1999
Subject: EEPROMS for the AGS PASS Systems
64. Meeting Date: October 12, 1999
Subject: New controlled access for the NASA run in the A1 primary cave
65. Meeting Date: November 23, 1999
Subject: A Switch for Ions to AtR and High Intensity Protons to g-2
66. Meeting Date: December 3, 1999
Subject: Removal of Steel from U-line Dump
67. Meeting Date: February 3, 2000
Subject: Single Bunch Test to AGS Switchyard
68. Meeting Date: February 7, 2000
Subject: The RHIC Permit Link/Beam Abort System Review
69. Meeting Date: February 8, 2000
Subject: Fence Around RHIC
70. Meeting Date: February 11, 2000
Subject: Shielding Design for E951 in the A3 Beam line
71. Meeting Date: February 22, 2000
Subject: Review of Open Items in RHIC Shielding Database
72. Meeting Date: April 13, 2000
Subject: Review of BAF Shielding Design for Upstream Tunnel Section
73. Meeting Date: April 18, 2000
Subject: Review Topics Related to Operation of RHIC with Controlled Berm
74. Meeting Date: May 2, 2000
Subject: Review of MP-6 Interlocks with the New Bypass Line
75. Meeting Date: July 14, 2000
Subject: Polarized Proton Commissioning in RHIC
76. Meeting Date: July 27, 2000
Subject: E938 Target Cave Shielding
77. Meeting Date: August 23, 2000
Subject: Polarized Proton Commissioning in RHIC
78. Meeting Date: August 24, 2000
Subject: Polarized Proton Commissioning & Proton/Ion Faults Near Thompson Rd.
79. Meeting Date: September 28, 2000
Subject: Review of U-Line Block House Removal80. Meeting Date: October 11, 2000
Subject: Shielding Design for E951 in the A3 Beam line
81. Meeting Date: October 12, 2000
Subject: Access Control for NASA run in A3
82. Meeting Date: November 8, 2000
Subject: Having a Substitute Critical Device for the RHIC X & Y Power Supplies
83. Meeting Date: December 5, 2000
Subject: Modifications to the RHIC Interlock to Prevent High Intensity Protons into AtR
84. Meeting Date: December 7, 2000
Subject: Proton Radiography Experiment in U-Line, Former E933 and now E955
85. Meeting Date: December 13, 2000
Subject: The Neutron Spallation Test Facility (E956) in the C7 Line
86. Meeting Date: February 13, 2001
Subject: Review of E951 in A3 Line
87. Meeting Date: February 26, 2001
Subject: Review of E951 (A3 Line) Expected Radiation Levels
88. Meeting Date: April 2, 2001 (sub-committee)
Subject: Improved Cross-Interlock for RHIC Operations
89. Meeting Date: May 22, 2001
Subject: Completing the RHIC Check-off List
90. Meeting Date: June 19, 2001 (sub-committee)
Subject: Requirements for Accelerating 60 Bunches in RHIC
91. Meeting Date: July 3, 2001
Subject: Light Ions from the Tandem to C-A Complex
92. Meeting Date: August 1, 2001
Subject: BAF Critical Devices
93. Meeting Date: September 19, 2001
Subject: Polarized Proton to RHIC
94. Meeting Date: October 5, 2001
Subject: Light Ions Beams from the Tandem to Booster
95. Meeting Date: December 11, 2001
Subject: The Proposed Booster Dump at B6
96. Meeting Date: January 31, 2002
Subject: The Proposed Extension of the RHIC Beam Dump Liners
97. Meeting Date: February 20, 2002
Subject: Configuration Changes in the Upstream BAF Tunnel
98. Meeting Date: March 28, 2002
Subject: Removal of Soil on the Tandem Roofs while the Tandems Operate
99. Meeting Date: September 5, 2002
Subject: Tandem Interlocks for Light Ions and Deuterons
100. Meeting Date: September 18, 2002
Subject: Changes in the Existing Tandem Interlocks
101. Meeting Date: November 7, 2002
Subject: Relocation of HEBT Gate from N63 to N132
102. Meeting Date: January 21, 2003
Subject: Polarized Protons in Booster with BAF
103. Meeting Date: March 4, 2003
Subject: For Linac Capping
104. Meeting Date: March 27, 2003
Subject: e-cooler Tests in Building 939
105. Meeting Date: April 29, 2003
Subject: PTR (E963) in the U Line
106. Meeting Date: September 9, 2003
Subject: Computer Software Options for RS LOTO
107. Meeting Date: February 11, 2004
Subject: The A20 Transformer Interlock for RHIC Operations
108. Meeting Date: March 9, 2004
Subject: Review of LINAC-BLIP Y Soil Cap
109. Meeting Date: March 12, 2004
Subject: KOPIO Tests in the D6 Beam Line and Atlas Test in D Line
110. Meeting Date: April 1 2004
Subject: Proposed Increase of the A20 Transformer Limit for RHIC Injection
111. Meeting Date: May 18, 2004
Subject: Review of AGS Cold Snake and Penetration into AGS Ring
112. Meeting Date: May 27, 2004
Subject: Energy Recovery Linac Experiment in Bldg. 912
113. Meeting Date: October 6, 2004
Subject: New RHIC Secondary Collimators
114. Meeting Date: November 1, 2004
Subject: Status of the A20 Penetration and the Relocation of the AGS Shutter
115. Meeting Date: December 7, 2004
Subject: RD1/2 as Critical Devices for the NSRL Target Room
116. Meeting Date: December 14, 2004
Subject: Removal of NRC Monitors and Chipmunk Locations at the Tandem
117. Meeting Date: February 8, 2005
Subject: New Intensity Monitor Transformers for the AGS and Concurrent Operation of BLIP with RHIC
118. Meeting Date: March 10, 2005
Subject: Stripping Experiment in REF Tunnel
119. Meeting Date: May 27, 2005
Subject: NASA Run in the D Line
120. Meeting Date: August 25, 2005
Subject: Controlled Access for NSRL Target Room without Operator Intervention
121. Meeting Date: January 23, 2006
Subject: Controlled Access for NSRL Target Room without Operator Intervention
122. Meeting Date: April 12, 2006
Subject: EBIS
123. Meeting Date: May 10, 2006
Subject: RD1/2 as Critical Devices for NSRL
124. Meeting Date: May 31, 2006
Subject: Review of Fault Study for RD 1/2 as Critical Devices for NSRL
125. Meeting Date: August 10, 2006
Subject: ERL Critical Devices, Klystron Room, and Fault Protection
126. Meeting Date: January 18, 2007
Subject: Domestic Water Pipe over TtB and ERL Items
127. Meeting Date: March 20, 2007
Subject: EBIS Port with Protons Injected into Booster via LtB
128. Meeting Date: April 18, 2007
129. Meeting Date: May 2, 2007
Subject: Controlled Access for NSRL Target Room without Operator Intervention Onsite Inspection of a Mockup
130. Meeting Date: May 21, 2007
Subject: Klystron Shielding and Commissioning
131. Meeting Date: August 13, 2007
Subject: Requirements for Moving Access Control from MCR to NSRL
132. Meeting Date: August 29, 2007
Subject: Modifications of the Berm Fence at 12 o'clock IR before FY08 RHIC Operations
133. Meeting Date: August 15, 2007
Subject: Design of Soil cap over the Linac HEBT Beam Stops
134. Meeting Date: October 17, 2007
Subject: RFid Tags and New Key Tree at RHIC and New Deuteron TtB Operating Parameters
135. Meeting date: April 22, 2008
Subject:
ASSRC/RSC Review of ERL SAD and ASE136. Meeting Date: May 1, 2008
137. Meeting Date: June 3, 2008
Subject: Upgrade of the Linac, Booster & AGS Interlock Systems
138. Meeting Date: July 1, 2008
Subject: RFQ Test at LINAC
139. Meeting Date: July 31, 2008
Subject: Design of Soil Cap over the Relocated Linac HEBT Beam Stops
140. Meeting Date: September 19, 2008
Subject: Change of Postings at Gates
141. Meeting Date:
Subject: