Brookhaven logo

 Run 7 (2007) QLI Analysis Links

Group Contacts

On-Line Documentation

QLI Analysis

Group Note Area

Link Page

Group Photos

C-A Call In Lists

C-A Broadcast

E-Logs

Spares Inventory

Training

BNL Stock

OWA Page

 

 

 

Power Supply Summary Reports

 

A summary report categorizing types of power supply by dates, faults and corrections made.

  MS Excel

 


Quench Events

 

Detailed Analysis of Daily Quench Events

MS Excel

  


Graphics

 

MS Excel

 

RHIC Pre-Run Checks (MS Power Point)

 


MTBF Performance

 

MS Excel

 

Controls Post Mortem QED Analysis Log can be found

here


 

Beam Induced

46   Quench Detector 3
IR Supply Faults 59   QPA / System Faults 20
Main PS Faults 41   Q.D. / Controls CFE 3
Controls 6B Yell. Permit 0   Controls Related 4
Operations Error 5   Cryo Related 8
Power Failure 3   Other 17
Maintenance Related 0   Power Supply Induced 0
Snake & Spin Rotator Detail   AGS Cold Snake Detail
      Total 209

 

 

 

 

Privacy and Security Notice

Power Supply Home