Previous Revisions




 

Facility Scope

Thomas Roser Latest Revision
 

Introduction

 

Nov. 2006

Facility Scope Nov. 2006
The Collider Rings Nov. 2006
The Collider Scenario Nov. 2006
 

Lattice and Beam Dynamics

Dejan Trbojevic

Arcs

Oct. 2004
Insertions Oct. 2004
Chromatic Effects Oct. 2004
gT-jump Oct. 2004
Lattice Correction Systems Oct. 2004
 

MAGNET SYSTEM

Peter Wanderer

Overview

Feb. 2006
Superconductor Feb. 2006
Standard Aperture Dipoles Feb. 2006
Standard Aperture Quadrupoles Feb. 2006
Sextupoles Feb. 2006
Trim Quadrupoles Feb. 2006
Standard Aperture Corrector Magnets Feb. 2006
Standard Aperture CQS Assemblies Feb. 2006
Large Aperture Correctors Feb. 2006
Insertion Quadrupoles Feb. 2006
Large Aperture CQ Assemblies Feb. 2006
100 mm Aperture Insertion Dipole Feb. 2006
180 mm Insertion Dipole Feb. 2006
Helical Dipoles Feb. 2006
References Feb. 2006
 

MAGNET ELECTRICAL SYSTEM

Jon Sandberg & Don Bruno

Power Supplies

Feb. 2006
Magnet Bus Feb. 2006
Cable Tray System Feb. 2006
Quench Protection System Feb. 2006
Insertion Power Supply Systems Feb. 2006
Correction Magnet Power Supply Systems Feb. 2006
Power Supply Connections of Corrector Magnets Feb. 2006
Main Magnet Power Supplies Feb. 2006
Insertion Power Supplies Feb. 2006
RHIC Bipolar Corrector Power Supplies Feb. 2006
Sextupole Power Supplies Feb. 2006
Siberian Snake Power Supplies Feb. 2006
Quench Protection System Feb. 2006
Quench Detection System Feb. 2006
Energy Extraction System Feb. 2006
Quench Link Feb. 2006
 

CRYOGENIC SYSTEM

Anthony Nicoletti

Introduction

Nov. 2005
Heat Load of Magnets and Refrigeration Distribution System Nov. 2005
Refrigerator Cycle Calculations Nov. 2005
Pressure Ratings Nov. 2005
Pressure Drop of Magnets and Distribution System Nov. 2005
Helium Inventory for RHIC Nov. 2005
System Thermal Mass and Cooldown/Warmup Time Estimates Nov. 2005
System Components Nov. 2005
Cryogenic Control System Nov. 2005
 

VACUUM SYSTEM

Dick Hseuh  

Beam Vacuum

Oct. 2004
System Configuration Oct. 2004
Instrumentation and Control System Oct. 2004
Experimental Vacuum Systems Oct. 2004
 

BEAM TRANSFER AND INJECTION

Wolfram Fischer

Principle Characteristics and Parameters

Oct. 2004
Equipment Oct. 2004
Operation Oct. 2004
Tolerances Oct. 2004
 

BEAM DUMP SYSTEM

Leif Ahrens

System Introduction

Oct. 2004
Kicker Magnet Requirements and Design Oct. 2004
Pulser and PFN Requirements and Design Oct. 2004
Beam Absorber Oct. 2004
Beam Instrumentation Oct. 2004
 

RF SYSTEMS

Mike Brennan

General Considerations
The Acceleration rf Cavity and Driver System
The Storage rf Cavity
The Wideband Cavity
Beam Loading Considerations
 

BEAM INSTRUMENTATION

Thomas Russo

Beam Position and Closed Orbit Measurement
Beam Current Monitors
Beam Loss Monitor System
Transverse Damper/Tune Measurement System
Beam Profile Monitor
Luminosity Monitor - Zero Degree Calorimeter
 

CONTROL SYSTEM

Don Barton

System Requirements
System Architecture
Front-End Systems
Network and Links
Control Center
Software
 

CONVENTIONAL FACILITIES



Martin Fallier
& Al pendzick

Ring Tunnel and Experimental Halls

Nov. 2004
Shielding Nov. 2004
 

COLLIDER INSTALLATION

Gary McIntyre

Ring Element Nomenclature System

Oct. 2004
Tunnel Survey and Magnet Alignment Oct. 2004
Tunnel Equipment Clear Zone Oct. 2004
Warm Space Components Allocations Oct. 2004
 

SAFETY SYSTEMS

Neville Williams

Personnel Safety Systems

Nov. 2004
 

POLARIZED PROTONS

Waldo MacKay

Polarized Proton Collider at RHIC

 

 

Oct. 2004
SYSTEMS INTEGRATION Jon Sandberg

Design Requirements Relating to Power Line Perturbation